You are on page 1of 35

Matthews Engineering Training Ltd

API 570
PIPING INSPECTION
Matthews Engineering Training Ltd
API 570
Piping Inspection Code
570
Matthews Engineering Training Ltd
API 570 COVERS IN-SERVICE
INSPECTION OF PIPING


To fit in with the philosophy of ANSI B31.3
DESIGN CODE FOR PROCESS PIPING
Matthews Engineering Training Ltd
THE SCOPE OF API 570
Mandatory:Almost any
metallic piping system:
Raw and finished oil products
Raw and finished chemical products
Hydrogen/fuel/flare gas systems
Sour/waste systems etc

Optional:
Water,steam and
condensate
Piping related to mechanical
equipment
(pumps/compressors etc)
Pressure vessels
Domestic sewers etc
Everything< in dia
Non-metallic piping
Matthews Engineering Training Ltd
API 570 INSPECTION
PRACTICES
Checks are needed for specific types of corrosion and cracking:
1. Injection points
2. Dead legs
3. CUI
4. Soil /Air(S/A) interfaces
5. Erosion and erosion/corrosion
6. SCC
7. Corrosion under linings
8. Fatigue cracking
9. Creep cracking
10. Brittle fracture
11. Freeze damage
Well look at some of
these in more detail
Matthews Engineering Training Ltd
INJECTION POINTS
Why is particular inspection attention (and TMLs)
needed at
injection points ?
.and what are TMLs anyway
Matthews Engineering Training Ltd
12in or 3D upstream
2
nd
change of
flow
direction
downstream (or
7.6m after the
first change)
INJECTION POINT
INSPECTION AREAS
This area is
known as:The
IPC(injection
point circuit)
Matthews Engineering Training Ltd
API 570 INSPECTION METHODS
Internal
visuals
TMLs
(4 quadrants)
External
visual
Matthews Engineering Training Ltd
DEADLEGS
Deadleg
Corrosion rates are
higher
around deadlegs
Redundant deadlegs
should be removed
Matthews Engineering Training Ltd
CORROSION UNDER
INSULATION (CUI)
Matthews Engineering Training Ltd
CORROSION UNDER
INSULATION (CUI)
Matthews Engineering Training Ltd
CORROSION UNDER
INSULATION (CUI)
Matthews Engineering Training Ltd
CORROSION UNDER
INSULATION (CUI)
Almost total wastage
of bolts
Matthews Engineering Training Ltd
CORROSION UNDER INSULATION (CUI)
API identifies the areas that are most
susceptible to CUI
Mist from
cooling towers
Near steam vents
and deluge systems
Acid vapours
Matthews Engineering Training Ltd
All LCS pipework operating continually at 4<t<120 degC

LCS pipework operating> 120 degC BUT INTERMITTENTLY

Austenitic Stainless steel at 65-205 DegC (for SCC)

Piping systems that vibrate a lot (insulation becomes damaged)

Piping systems with damaged wrappings
CORROSION UNDER
INSULATION (CUI)
Matthews Engineering Training Ltd
CORROSION UNDER FIXED LININGS
In general ,API does not
require removal of linings
for inspectionsAS LONG
AS THE LINING IS IN
GOOD CONDITION
BUT
Matthews Engineering Training Ltd
SOIL/AIR INTERFACES
All interfaces without cathodic protection
Matthews Engineering Training Ltd
The API 570 rule is that you should inspect
areas for CUI where the insulation is damaged
CORROSION UNDER
INSULATION (CUI)
Matthews Engineering Training Ltd
RECOMMENDED EXTENT OF CUI
EXAMINATION(BY CLASS)

Type of circuit
% NDT on areas
with damaged
insulation
% NDT on
suspect areas
within CUI
temperature
range
Class 1 75% 50%
Class 2 50% 33%
Class 3 25% 10%
Matthews Engineering Training Ltd
EROSION AND EROSION-CORROSION
LOCATIONS
Matthews Engineering Training Ltd
Control valves (especially when there is flash-off
Orifice plate
Pump discharges
Elbows
Pipe features that produce turbulence
TMLS FOR
EROSION/CORROSION
Downstream of ..
Matthews Engineering Training Ltd
An
example
EROSION/CORROSION
Matthews Engineering Training Ltd
Erosion/Corrosion
after flow-restriction
features
Matthews Engineering Training Ltd
STRESS CORROSION
CRACKING (SCC)
Rule:
In most circumstances,SCC is due to

Matthews Engineering Training Ltd
SCC ON A GAS PIPELINE
COMPONENT
Matthews Engineering Training Ltd
SCC ON A GAS PIPELINE
COMPONENT
Matthews Engineering Training Ltd
What is this?
Matthews Engineering Training Ltd
API 570 GUIDE ON REPAIR
PATCHES
D
Max D/2
Repair patch
Not permitted
25mm min radii
Matthews Engineering Training Ltd
API 570 GUIDE ON REPAIR
PATCHES
Requires a full repair sleeve
Min 2D
Matthews Engineering Training Ltd
API 570 INSPECTION
INTERVALS
The maximum permitted interval
depends on pipe class
Class 1:Highest risk/consequence
Class 2 : Medium risk
Class 3: Low risk

Matthews Engineering Training Ltd
MAXIMUM API INSPECTION
INTERVALS (BY CLASS)
Type of circuit Thickness
measurements
External visual
Class 1 5 years 5 years
Class 2 10 years 5 years
Class 3 10 years 10 years
Injection points 3 years By class
S/A interfaces - By class
Matthews Engineering Training Ltd
API 570 PIPING
CLASSES
Class 1
Flammable services/flash-off leading to brittle fracture
Explosive vapours after flash-off
H
2
S gaseous
Hydroflouric acid
Piping over public roads
Matthews Engineering Training Ltd
API 570 PIPING
CLASSES
Class 2
Most other process piping
On-site hydrocarbons
H2, fuel gas and natural gas
On-site acid and caustics
Matthews Engineering Training Ltd
API 570 PIPING CLASSES
Class 3
Fluids that will not flash
off (even if they are
flammable)
Distillate/product
storage/loading lines
Off-site acids and
caustics
Matthews Engineering Training Ltd
API 570 SUMMARY
API 570 specifies the main points to look for

Remember the pipe classes (and their inspection
periods)

Simple wall thickness determination
570