Upon completion of this course, you will be able to: Master the Preparation before RNC hardware installation; Master how to finish the RNC hardware installation.
Upon completion of this course, you will be able to: Master the Preparation before RNC hardware installation; Master how to finish the RNC hardware installation.
Upon completion of this course, you will be able to: Master the Preparation before RNC hardware installation; Master how to finish the RNC hardware installation.
www.huawei.com Internal BSC6810 Hardware Installation BSC6810V200R010 HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 2 Upon completion of this course, you will be able to: Master the Preparation before RNC hardware installation ; Master how to finish the RNC hardware installation. HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 3 References RNC site prepairation guidelines RNC installation guide HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 4 Chapter 1 Preparation Before Installation Chapter 2 Installation of Racks Chapter 3 Installation of Boards Chapter 4 Installation of Cables Chapter 5 Installation of Cabinet Accessories Chapter 6 Checking RNC Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 5 Preparation Before Installation Layout of the RNC Equipment Room HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 6 Preparation Before Installation Space Requirements for RNC Cabling HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 7 Preparation Before Installation Power Supply Requirements of the RNC HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 8 Preparation Before Installation Transport Requirements of the RNC
Port Maximu m Number Boar d Port Type Remarks E1/T1 port 1152 AEUa DB44 Applicable to the Iu-CS, Iur, and Iub interfaces, but mainly to the ATM-based Iub interface 1152 PEUa DB44 Applicable to the Iu-CS, Iur, and Iub interfaces, but mainly to the IP-based Iub interface Channelized STM- 1/OC-3 port 160 AOU a LC/P C Applicable to the Iu-CS, Iur, and Iub interfaces, but mainly to the ATM-based Iub interface Unchannelized STM-1/OC-3c port 320 UOIa LC/P C Applicable to the ATM-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub interfaces FE electrical port 640 FG2a RJ45 Applicable to the IP-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub interfaces GE electrical port 160 FG2a RJ45 Applicable to the IP-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub interfaces GE optical port 160 GOU a LC/P C Applicable to the IP-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub interfaces HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 9 Preparation Before Installation (1) Grounding bar (2) Equipment room (3) Indoor equipment (4) Collective PGND cable (5) PGND cables Grounding Schemes of the RNC HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 10 Preparing Tools for RNC Installation General Tools Type Tools Measuring tool Long tape measure, 50 m ribbon tape, 5 m tape measure, 400 mm level bar, level instrument Marking tools Marking pen, ink fountain, pencil Drilling tools Percussion drill with matching bits of 6, 8, 10, 12, 14, and 16, vacuum cleaner Fastening tools Straight screwdrivers (M3 to M6) Cross screwdrivers (M3 to M6) Adjustable wrench Socket wrenches (M6, M8, M10, M12, M14, M17, M19) Double offset ring wrenches (M6, M8, M10, M12, M14, M17, M19) Combination wrenches (M17 and M19) Long-arm wrench Pliers Sharp nose pliers, diagonal pliers, pincer pliers, electric hand drill, file, handsaw, crowbar, rubber hammer, claw hammer Auxiliary tools Brush, tweezers, paper knife, bellows, plumb, soldering iron, solder wires, fork, ladder, heat blower, solder absorber, insulating tape HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 11 Preparing Tools for RNC Installation Dedicated Tools The dedicated tools used for installing the RNC cabinet are the earth resistance meter, ESD wrist strap, ESD glove, cable peeler, clamping pliers, feeder cutter, crimping pliers for SMB, RJ-45 crimping pliers, wire punchdown tool, wire cutter, non-conductive screwdriver, safety knife, peeler for 75-ohm coaxial cables, connector crimping pliers for 75-ohm coaxial cables, and multi-purpose crimping pliers. Meters The meters used for installing the RNC cabinet are the multimeter, 500 V megohmmeter (for testing insulation resistance), BER tester, and optical power meter. HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12 Chapter 1 Preparation Before Installation Chapter 2 Installation of Racks Chapter 3 Installation of Boards Chapter 4 Installation of Cables Chapter 5 Installation of Cabinet Accessories Chapter 6 Checking RNC Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 13 Installing the RNC Cabinet on the Concrete Floor (N68E-22) Positioning the RNC Cabinet HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 14 Installing the RNC Cabinet on the Concrete Floor (N68E-22) Install expansion bolt assemblies HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 15 Installing the RNC Cabinet on the Concrete Floor (N68E-22) Securing the RNC Cabinet (1) Bolt M12 x 80 (2) Spring washer 12 (3) Black plastic cover (4) Insulating pad (5) Adjusting pad (optional) HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 16 Installing the RNC Cabinet on the Concrete Floor (N68E-22) Testing the Insulation of the RNC Cabinet (1) Resistance tester of the multimeter (2) Fixing bolt (3) Grounding bolt HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 17 Installing the RNC Cabinet on the Concrete Floor (N68E-22) Combining RNC Cabinets HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 18 Installing the RNC Cabinet on the ESD Floor (N68E-22) Positioning the RNC Cabinet HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 19 Installing the RNC Cabinet on the ESD Floor (N68E-22) Install expansion bolt assemblies HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 20 Installing the RNC Cabinet on the ESD Floor (N68E-22) Adjusting the height of the N800 support (1) Height locking bolts (on two sides) (2) Height locking bolts (in the middle) (3) Height scale HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 21 Installing the RNC Cabinet on the ESD Floor (N68E-22) Assembling the N800 supports and rails (1) Support (2) Guide rail (3) Bolt M12 x 30 (4) Spring washer (5) Flat washer HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 22 Installing the RNC Cabinet on the ESD Floor (N68E-22) Fix the N800 supports and guide rails (1) Support (2) Guide rail (3Bolt M12 x 60 (4) Spring washer (5) Large flat washer (6) Expansion tube (7) Nut (8) Adjusting pad (9) Horizontal ruler HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 23 Installing the RNC Cabinet on the ESD Floor (N68E-22) Layout of N800 supports and guide rails in a cabinet row HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 24 Installing the RNC Cabinet on the ESD Floor (N68E-22) Installing Fixing Pieces to the Floor Holder (1) Support (2) Guide rail (3) Fixing piece (4) Bolt M12 x 30 (5) Spring washer (6) Flat washer HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 25 Installing the RNC Cabinet on the ESD Floor (N68E-22) Securing the RNC Cabinet (1) Rack (2) Guide rail (3) Support (4) Expansion bolt (5) Spring washer (6) Insulating pad (7) Adjusting pad (8) Flat washer (9) Nut HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 26 Installing the RNC Cabinet on the ESD Floor (N68E-22) Testing the Insulation of the RNC Cabinet (1) Resistance tester of the multimeter (2) Fixing bolt (3) Grounding bolt HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 27 Installing the RNC Cabinet on the ESD Floor (N68E-22) Combining RNC Cabinets HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 28 Installing Floor Holders and Restoring the ESD Floor (1) Cabinet (2) Guide rail (3) Support (4) Bolt M12 x 30 (5) Spring washer 12 (6) Flat washer 12 (7) Front floor holder (8) Fixing piece (9) Side floor holder Installing the RNC Cabinet on the ESD Floor (N68E-22) HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 29 Chapter 1 Preparation Before Installation Chapter 2 Installation of Racks Chapter 3 Installation of Boards Chapter 4 Installation of Cables Chapter 5 Installation of Cabinet Accessories Chapter 6 Checking RNC Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 30 Installation RNC Boards Removing/Inserting RNC Board HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 31 Chapter 1 Preparation Before Installation Chapter 2 Installation of Racks Chapter 3 Installation of Boards Chapter 4 Installation of Cables Chapter 5 Installation of Cabinet Accessories Chapter 6 Checking RNC Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 32 Installation of Cables Power Cable Connection on RNC Cabinet HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 33 Power Cable Connection on PDF Installation of Cables HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 34 Installing the Monitoring Signal Cables Installation of Cables HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 35 Installing RNC BITS Clock Signal Cables Installing RNC Line Clock Signal Cables Installing RNC Y-Shaped Clock Signal Cables Installing RNC Clock Signal Cables Installation of Cables HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 36 Ethernet Cables to Interconnect the SCUa Boards Ethernet Cables to Connect the OMUa Boards Ethernet Cables to Connect the FG2a Boards Installing RNC Ethernet Cables Installation of Cables HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 37 Installing RNC Optical Cables Installation of Cables HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 38 Installing RNC E1/T1 Cables Installation of Cables (1) DB44 connector (2) Main label (Identifying the code, version, and manufacturer information of the cable) (3) Label (Identifying a coaxial cable) (4) Metal case of the DB44 connector HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 39 Chapter 1 Preparation Before Installation Chapter 2 Installation of Racks Chapter 3 Installation of Boards Chapter 4 Installation of Cables Chapter 5 Installation of Cabinet Accessories Chapter 6 Checking RNC Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 40 Installing Side Doors Installation of Cabinet Accessories Remove the connecting plate from the top of the cabinet
Link the PGND cable on the rack to the grounding bolt on the side door
Place the side door properly, align the eight M6 x 12 screws with the installation holes, and then fasten the screws HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 41 Installing Front and Back Doors Installation of Cabinet Accessories Insert the pivot pin of the door into the hole in the lower lintel of the cabinet
Pull down the latch, align the latch with the pivot hole in the upper lintel of the cabinet, and then release the latch so as to fix the door onto the cabinet HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 42 Installing PGND Cables to RNC Cabinet Doors Installation of Cabinet Accessories install the PGND cable of the side door
install the PGND cable of the front/back door HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 43 Chapter 1 Preparation Before Installation Chapter 2 Installation of Racks Chapter 3 Installation of Boards Chapter 4 Installation of Cables Chapter 5 Installation of Cabinet Accessories Chapter 6 Checking RNC Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 44 Checking RNC Installation Checklist for RNC Cabinet Installation No. Check Item 1 The cabinets are arranged in accordance with the engineering design. 2 The supports are positioned and spaced in accordance with the drawing of the installation holes. (This item applies to the cabinet installation on the ESD floor.) 3 All supports are fixed to the floor correctly. (This item applies to the cabinet installation on the ESD floor.) 4 All components of the supports are installed correctly. (This item applies to the cabinet installation on the ESD floor.) 5 All floor holders are installed at the same height. (This item applies to the cabinet installation on the ESD floor supported by floor holders.) 6 Each cabinet is well insulated from the support or the floor. 7 All rodent-resistant plastic boards are installed on the top and bottom of the cabinets. 8 All installation holes in the N68E-22 cabinet are covered with black plastic covers. 9 All cabinet accessories are installed, including front door, back door, and side doors. 10 The row labels, column labels, and product labels are attached to the specified positions. 11 The ESD wrist strap is connected to the ESD bonding point on the cabinet. 12 All connecting plates are installed for combining cabinets. 13 Insulation is performed for shockproof parts between multiple rows of cabinets. HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 45 Checking RNC Installation Checklist for RNC Cabinet Installation No. Check Item 14 All bolts are fixed with flat washers and spring washers in a correct order. 15 The cabinets are stable and orderly. 16 All the adjacent cabinets stand side by side in a straight line. 17 The vertical deviation of cabinet installation is less than 3 mm. 18 All cabinet side doors facing the aisle are aligned with the error less than 5 mm. 19 The surfaces of the cabinets are clean without any fingerprint or smudge. There is no dust, excessive cable tie ends or other sundries either inside or outside each cabinet. 20 All kinds of labels are correct, legible and intact. 21 The front and back doors of the cabinets are easy to open or close. 22 The modules in one cabinet are aligned from the top down. 23 All the filler panels are installed. 24 All boards are installed in proper positions, and their DIP switches are properly set. 25 No parts on the cabinets are damaged or detached. No cables are damaged or snapped. 26 No paint is detached. No distortion exists. HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 46 Checking RNC Installation Checklist for power cables and PGND cables Installation No. Check Item 1 The 48 V power cables are blue, the RTN power cables are black, and the PGND cables are green and yellow. The power cables shall meet the field requirements. 2 All the core wires of the power cables and PGND cables are made of copper. 3 The cross-sectional areas of power cables and PGND cables connecting the primary power supply to the PDF are not smaller than 95 mm2 4 The cross-sectional areas of the power cables and PGND cables connecting the PDF to the RNC cabinets are not less than 25 mm2 5 No power cable or PGND cable is damaged or snapped. 6 No welding point exists in the power cables and PGND cables. 7 No breaking device such as the switch or fuse exists in the electric connection of the grounding system. 8 The power cables and PGND cables of extra length are trimmed rather than coiled. 9 The cables from the DC power distribution panel to the PDF work in dual-channel and hot backup mode. 10 The grounding bars and PGND bars are finally connected to one grounding conductor. 11 The earth resistance is smaller than 10 ohms. 12 The PGND cable of the PDF is connected to the positive pole of the DC power distribution panel which is then grounded with a cable whose cross-sectional area meets the requirement. 13 The grounding bar of the PDF is well connected to the grounding bar provided by the customer. HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 47 Checking RNC Installation No. Check Item 14 The output current values of the PDF and the DC power distribution panel meet the requirements. 15 All power cables and PGND cables are not short-circuited or connected reversely. 16 The OT terminals of the power cables and PGND cables are welded or crimped securely. 17 The bare wires and lug handles at the OT terminals are tightly wrapped up using insulating tapes or heat-shrinkable tubes. 18 All OT terminals are equipped with the flat washers and spring washers and the terminals are in good contact with the flat washers and the spring washers. 19 If you have to connect more than one power cable to one wiring post, ensure that the OT terminals do not overlap completely. Instead, use cross-installation mode or back-to-back installation mode. If you have to use the complete overlap mode, bend the terminal by 45 or 90. Put the smaller OT terminal on the larger one when the OT terminals overlap each other. 20 The power cables and PGND cables connecting the power distribution box with the functional modules, and the PGND cables connecting the modules with the grounding bar are all correctly installed and have satisfactory contact. 21 The front, back, and side doors are respectively connected to the grounding bolts on the lower enclosure of the cabinet through the 6 mm2 green and yellow cables. 22 The power cables and PGND cables are bound separately from other cables. 23 The power cables and PGND cables are laid straight and bound orderly in the cabinets or in the PDF. Each switch on the PDF is marked with the number of the corresponding cabinet. 24 Engineering labels are attached to both ends of each power cable or PGND cable. 25 The power cable of the alarm box laid on a wall is in a PVC trough. Checklist for power cables and PGND cables Installation HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 48 Checking RNC Installation Checklist for signal cable Installation No. Check Item 1 The signal cables are routed in accordance with the engineering design. 2 No welding point exists in the signal cables. 3 No signal cable is damaged or snapped. 4 The signal cable connectors are intact and installed correctly. 5 The signal cables are laid out for the convenience of maintenance and expansion. 6 The signal cables routed on a cable ladder are bound on the cross stays using cable ties. The signal cables routed in a cable trough need not be bound. However, they are laid out neatly without tangling and do not run out of the trough. They are bound as a whole at the entrance and exit of the trough and at the turning points. 7 Proper surplus length is reserved for the signal cables near connectors for easy inserting and pulling of the connectors. 8 Proper extra length is reserved for the signal cables at turning points. The turning radius meets the requirement. 9 Leave the signal cables a little slack near the cable holes in the cabinet. 10 Proper surplus length is reserved for the signal cables at the point where they are led down from the cable rack. 11 The cables whose connectors are far away from the cable entrance are arranged at the external side of the cable bundle, while those near the entrance are arranged at the internal side of the cable bundle. The trunk cables are laid out smoothly without any tangling. HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 49 Checking RNC Installation No. Check Item 12 The signal cables connected to the left part of the subrack are led out of the subrack from the left. Similarly, the signal cables connected to the right part of the subrack are led out of the subrack from the right. 13 The optical cables must be sheathed using corrugated pipes at outsides of cabinets. Both ends of the pipes must be fastened. The edges are smooth or be processed for cutting prevention. 14 The optical cables are not tensed or tangled at turning points. The optical cables in pairs are laid out neatly and bound to the extent that the optical cables can just move freely in the cable ties. 15 No other cables are laid on the optical cables. 16 The extra optical cables are coiled up in the optical cable box at the back of the cabinet. 17 The connectors of the optical cables that are laid but not in use are covered with protective caps. 18 The signal cable of the alarm box laid on a wall is in a PVC trough. The extra part of the cable is coiled up and placed beneath the floor beside the alarm box or on the cable ladder. 19 The signal cables are bound separately from the power cables. 20 The signal cables are bound and arranged neatly and closely. The cable ties are spaced evenly. The tips of the cable ties point to the same direction. 21 The extra parts of the cable ties are fully cut off. 22 The identifiers (labels) attached to both ends of the signal cables are legible. They are attached neatly and point to the same direction. Checklist for signal cable Installation www.huawei.com Thank You