BSC6810 Hardware
Installation
BSC6810V200R010
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 2
Upon completion of this course, you
will be able to:
Master the Preparation before
RNC hardware installation ;
Master how to finish the RNC
hardware installation.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 3
References
RNC site prepairation guidelines
RNC installation guide
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 4
Chapter 1 Preparation Before Installation
Chapter 2 Installation of Racks
Chapter 3 Installation of Boards
Chapter 4 Installation of Cables
Chapter 5 Installation of Cabinet Accessories
Chapter 6 Checking RNC Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 5
Preparation Before Installation
Layout of the RNC Equipment Room
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 6
Preparation Before Installation
Space Requirements for RNC Cabling
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 7
Preparation Before Installation
Power Supply Requirements of the RNC
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 8
Preparation Before Installation
Transport Requirements of the RNC



Port
Maximu
m
Number
Boar
d
Port
Type
Remarks
E1/T1 port 1152 AEUa DB44 Applicable to the Iu-CS, Iur, and Iub interfaces, but mainly
to the ATM-based Iub interface
1152 PEUa DB44 Applicable to the Iu-CS, Iur, and Iub interfaces, but mainly
to the IP-based Iub interface
Channelized STM-
1/OC-3 port
160 AOU
a
LC/P
C
Applicable to the Iu-CS, Iur, and Iub interfaces, but mainly
to the ATM-based Iub interface
Unchannelized
STM-1/OC-3c port
320 UOIa LC/P
C
Applicable to the ATM-based Iu-CS, Iu-PS, Iu-BC, Iur, and
Iub interfaces
FE electrical port 640 FG2a RJ45 Applicable to the IP-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub
interfaces
GE electrical port 160 FG2a RJ45 Applicable to the IP-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub
interfaces
GE optical port 160 GOU
a
LC/P
C
Applicable to the IP-based Iu-CS, Iu-PS, Iu-BC, Iur, and Iub
interfaces
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 9
Preparation Before Installation
(1) Grounding bar
(2) Equipment room
(3) Indoor equipment
(4) Collective PGND cable
(5) PGND cables
Grounding Schemes of the RNC
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 10
Preparing Tools for RNC Installation
General Tools
Type Tools
Measuring tool Long tape measure, 50 m ribbon tape, 5 m tape measure, 400 mm level bar,
level instrument
Marking tools Marking pen, ink fountain, pencil
Drilling tools Percussion drill with matching bits of 6, 8, 10, 12, 14, and 16, vacuum
cleaner
Fastening tools Straight screwdrivers (M3 to M6)
Cross screwdrivers (M3 to M6)
Adjustable wrench
Socket wrenches (M6, M8, M10, M12, M14, M17, M19)
Double offset ring wrenches (M6, M8, M10, M12, M14, M17, M19)
Combination wrenches (M17 and M19)
Long-arm wrench
Pliers Sharp nose pliers, diagonal pliers, pincer pliers, electric hand drill, file, handsaw,
crowbar, rubber hammer, claw hammer
Auxiliary tools Brush, tweezers, paper knife, bellows, plumb, soldering iron, solder wires, fork,
ladder, heat blower, solder absorber, insulating tape
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 11
Preparing Tools for RNC Installation
Dedicated Tools
The dedicated tools used for installing the RNC cabinet are the earth resistance
meter, ESD wrist strap, ESD glove, cable peeler, clamping pliers, feeder cutter,
crimping pliers for SMB, RJ-45 crimping pliers, wire punchdown tool, wire cutter,
non-conductive screwdriver, safety knife, peeler for 75-ohm coaxial cables,
connector crimping pliers for 75-ohm coaxial cables, and multi-purpose crimping
pliers.
Meters
The meters used for installing the RNC cabinet are the multimeter, 500 V
megohmmeter (for testing insulation resistance), BER tester, and optical power
meter.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 12
Chapter 1 Preparation Before Installation
Chapter 2 Installation of Racks
Chapter 3 Installation of Boards
Chapter 4 Installation of Cables
Chapter 5 Installation of Cabinet Accessories
Chapter 6 Checking RNC Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 13
Installing the RNC Cabinet on the Concrete Floor (N68E-22)
Positioning the RNC Cabinet
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 14
Installing the RNC Cabinet on the Concrete Floor (N68E-22)
Install expansion bolt assemblies
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 15
Installing the RNC Cabinet on the Concrete Floor (N68E-22)
Securing the RNC Cabinet
(1) Bolt M12 x 80
(2) Spring washer 12
(3) Black plastic cover
(4) Insulating pad
(5) Adjusting pad (optional)
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 16
Installing the RNC Cabinet on the Concrete Floor (N68E-22)
Testing the Insulation of the RNC Cabinet
(1) Resistance tester of the multimeter
(2) Fixing bolt
(3) Grounding bolt
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 17
Installing the RNC Cabinet on the Concrete Floor (N68E-22)
Combining RNC Cabinets
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 18
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Positioning the RNC Cabinet
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 19
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Install expansion bolt assemblies
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 20
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Adjusting the height of the N800 support
(1) Height locking bolts (on two sides)
(2) Height locking bolts (in the middle)
(3) Height scale
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 21
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Assembling the N800 supports and rails
(1) Support
(2) Guide rail
(3) Bolt M12 x 30
(4) Spring washer
(5) Flat washer
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 22
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Fix the N800 supports and guide rails
(1) Support
(2) Guide rail
(3Bolt M12 x 60
(4) Spring washer
(5) Large flat washer
(6) Expansion tube
(7) Nut
(8) Adjusting pad
(9) Horizontal ruler
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 23
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Layout of N800 supports and guide rails in a cabinet row
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 24
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Installing Fixing Pieces to the Floor Holder
(1) Support
(2) Guide rail
(3) Fixing piece
(4) Bolt M12 x 30
(5) Spring washer
(6) Flat washer
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 25
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Securing the RNC Cabinet
(1) Rack
(2) Guide rail
(3) Support
(4) Expansion bolt
(5) Spring washer
(6) Insulating pad
(7) Adjusting pad
(8) Flat washer
(9) Nut
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 26
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Testing the Insulation of the RNC Cabinet
(1) Resistance tester of the multimeter
(2) Fixing bolt
(3) Grounding bolt
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 27
Installing the RNC Cabinet on the ESD Floor (N68E-22)
Combining RNC Cabinets
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 28
Installing Floor Holders and Restoring the ESD Floor
(1) Cabinet
(2) Guide rail
(3) Support
(4) Bolt M12 x 30
(5) Spring washer 12
(6) Flat washer 12
(7) Front floor holder
(8) Fixing piece
(9) Side floor holder
Installing the RNC Cabinet on the ESD Floor (N68E-22)
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 29
Chapter 1 Preparation Before Installation
Chapter 2 Installation of Racks
Chapter 3 Installation of Boards
Chapter 4 Installation of Cables
Chapter 5 Installation of Cabinet Accessories
Chapter 6 Checking RNC Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 30
Installation RNC Boards
Removing/Inserting RNC Board
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 31
Chapter 1 Preparation Before Installation
Chapter 2 Installation of Racks
Chapter 3 Installation of Boards
Chapter 4 Installation of Cables
Chapter 5 Installation of Cabinet Accessories
Chapter 6 Checking RNC Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 32
Installation of Cables
Power Cable Connection on RNC Cabinet
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 33
Power Cable Connection on PDF
Installation of Cables
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 34
Installing the Monitoring Signal Cables
Installation of Cables
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 35
Installing RNC BITS
Clock Signal Cables
Installing RNC Line
Clock Signal Cables
Installing RNC Y-Shaped
Clock Signal Cables
Installing RNC Clock Signal Cables
Installation of Cables
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 36
Ethernet Cables to
Interconnect the SCUa
Boards
Ethernet Cables to
Connect the OMUa
Boards
Ethernet Cables to
Connect the FG2a Boards
Installing RNC Ethernet Cables
Installation of Cables
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 37
Installing RNC Optical Cables
Installation of Cables
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 38
Installing RNC E1/T1 Cables
Installation of Cables
(1) DB44 connector (2) Main label (Identifying the code, version, and
manufacturer information of the cable)
(3) Label (Identifying a coaxial cable) (4) Metal case of the DB44 connector
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 39
Chapter 1 Preparation Before Installation
Chapter 2 Installation of Racks
Chapter 3 Installation of Boards
Chapter 4 Installation of Cables
Chapter 5 Installation of Cabinet Accessories
Chapter 6 Checking RNC Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 40
Installing Side Doors
Installation of Cabinet Accessories
Remove the connecting plate from the
top of the cabinet

Link the PGND cable on the rack to the
grounding bolt on the side door

Place the side door properly, align the
eight M6 x 12 screws with the installation
holes, and then fasten the screws
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 41
Installing Front and Back Doors
Installation of Cabinet Accessories
Insert the pivot pin of the door into the
hole in the lower lintel of the cabinet

Pull down the latch, align the latch with
the pivot hole in the upper lintel of the
cabinet, and then release the latch so as
to fix the door onto the cabinet
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 42
Installing PGND Cables to RNC Cabinet Doors
Installation of Cabinet Accessories
install the PGND cable of the side door

install the PGND cable of the front/back
door
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 43
Chapter 1 Preparation Before Installation
Chapter 2 Installation of Racks
Chapter 3 Installation of Boards
Chapter 4 Installation of Cables
Chapter 5 Installation of Cabinet Accessories
Chapter 6 Checking RNC Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 44
Checking RNC Installation
Checklist for RNC Cabinet Installation
No. Check Item
1 The cabinets are arranged in accordance with the engineering design.
2 The supports are positioned and spaced in accordance with the drawing of the installation holes. (This item applies to the
cabinet installation on the ESD floor.)
3 All supports are fixed to the floor correctly. (This item applies to the cabinet installation on the ESD floor.)
4 All components of the supports are installed correctly. (This item applies to the cabinet installation on the ESD floor.)
5 All floor holders are installed at the same height. (This item applies to the cabinet installation on the ESD floor supported by
floor holders.)
6 Each cabinet is well insulated from the support or the floor.
7 All rodent-resistant plastic boards are installed on the top and bottom of the cabinets.
8 All installation holes in the N68E-22 cabinet are covered with black plastic covers.
9 All cabinet accessories are installed, including front door, back door, and side doors.
10 The row labels, column labels, and product labels are attached to the specified positions.
11 The ESD wrist strap is connected to the ESD bonding point on the cabinet.
12 All connecting plates are installed for combining cabinets.
13 Insulation is performed for shockproof parts between multiple rows of cabinets.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 45
Checking RNC Installation
Checklist for RNC Cabinet Installation
No. Check Item
14 All bolts are fixed with flat washers and spring washers in a correct order.
15 The cabinets are stable and orderly.
16 All the adjacent cabinets stand side by side in a straight line.
17 The vertical deviation of cabinet installation is less than 3 mm.
18 All cabinet side doors facing the aisle are aligned with the error less than 5 mm.
19 The surfaces of the cabinets are clean without any fingerprint or smudge. There is no dust, excessive cable tie ends or other
sundries either inside or outside each cabinet.
20 All kinds of labels are correct, legible and intact.
21 The front and back doors of the cabinets are easy to open or close.
22 The modules in one cabinet are aligned from the top down.
23 All the filler panels are installed.
24 All boards are installed in proper positions, and their DIP switches are properly set.
25 No parts on the cabinets are damaged or detached. No cables are damaged or snapped.
26 No paint is detached. No distortion exists.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 46
Checking RNC Installation
Checklist for power cables and PGND cables Installation
No. Check Item
1 The 48 V power cables are blue, the RTN power cables are black, and the PGND cables are green and yellow. The
power cables shall meet the field requirements.
2 All the core wires of the power cables and PGND cables are made of copper.
3 The cross-sectional areas of power cables and PGND cables connecting the primary power supply to the PDF are not
smaller than 95 mm2
4 The cross-sectional areas of the power cables and PGND cables connecting the PDF to the RNC cabinets are not less
than 25 mm2
5 No power cable or PGND cable is damaged or snapped.
6 No welding point exists in the power cables and PGND cables.
7 No breaking device such as the switch or fuse exists in the electric connection of the grounding system.
8 The power cables and PGND cables of extra length are trimmed rather than coiled.
9 The cables from the DC power distribution panel to the PDF work in dual-channel and hot backup mode.
10 The grounding bars and PGND bars are finally connected to one grounding conductor.
11 The earth resistance is smaller than 10 ohms.
12 The PGND cable of the PDF is connected to the positive pole of the DC power distribution panel which is then grounded
with a cable whose cross-sectional area meets the requirement.
13 The grounding bar of the PDF is well connected to the grounding bar provided by the customer.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 47
Checking RNC Installation
No. Check Item
14 The output current values of the PDF and the DC power distribution panel meet the requirements.
15 All power cables and PGND cables are not short-circuited or connected reversely.
16 The OT terminals of the power cables and PGND cables are welded or crimped securely.
17 The bare wires and lug handles at the OT terminals are tightly wrapped up using insulating tapes or heat-shrinkable tubes.
18 All OT terminals are equipped with the flat washers and spring washers and the terminals are in good contact with the flat
washers and the spring washers.
19 If you have to connect more than one power cable to one wiring post, ensure that the OT terminals do not overlap completely.
Instead, use cross-installation mode or back-to-back installation mode. If you have to use the complete overlap mode, bend the
terminal by 45 or 90. Put the smaller OT terminal on the larger one when the OT terminals overlap each other.
20 The power cables and PGND cables connecting the power distribution box with the functional modules, and the PGND cables
connecting the modules with the grounding bar are all correctly installed and have satisfactory contact.
21 The front, back, and side doors are respectively connected to the grounding bolts on the lower enclosure of the cabinet through
the 6 mm2 green and yellow cables.
22 The power cables and PGND cables are bound separately from other cables.
23 The power cables and PGND cables are laid straight and bound orderly in the cabinets or in the PDF. Each switch on the PDF
is marked with the number of the corresponding cabinet.
24 Engineering labels are attached to both ends of each power cable or PGND cable.
25 The power cable of the alarm box laid on a wall is in a PVC trough.
Checklist for power cables and PGND cables Installation
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 48
Checking RNC Installation
Checklist for signal cable Installation
No. Check Item
1 The signal cables are routed in accordance with the engineering design.
2 No welding point exists in the signal cables.
3 No signal cable is damaged or snapped.
4 The signal cable connectors are intact and installed correctly.
5 The signal cables are laid out for the convenience of maintenance and expansion.
6 The signal cables routed on a cable ladder are bound on the cross stays using cable ties. The signal cables routed in a
cable trough need not be bound. However, they are laid out neatly without tangling and do not run out of the trough. They
are bound as a whole at the entrance and exit of the trough and at the turning points.
7 Proper surplus length is reserved for the signal cables near connectors for easy inserting and pulling of the connectors.
8 Proper extra length is reserved for the signal cables at turning points. The turning radius meets the requirement.
9 Leave the signal cables a little slack near the cable holes in the cabinet.
10 Proper surplus length is reserved for the signal cables at the point where they are led down from the cable rack.
11 The cables whose connectors are far away from the cable entrance are arranged at the external side of the cable bundle,
while those near the entrance are arranged at the internal side of the cable bundle. The trunk cables are laid out smoothly
without any tangling.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
Page 49
Checking RNC Installation
No. Check Item
12 The signal cables connected to the left part of the subrack are led out of the subrack from the left. Similarly, the signal
cables connected to the right part of the subrack are led out of the subrack from the right.
13 The optical cables must be sheathed using corrugated pipes at outsides of cabinets. Both ends of the pipes must be
fastened. The edges are smooth or be processed for cutting prevention.
14 The optical cables are not tensed or tangled at turning points. The optical cables in pairs are laid out neatly and bound to the
extent that the optical cables can just move freely in the cable ties.
15 No other cables are laid on the optical cables.
16 The extra optical cables are coiled up in the optical cable box at the back of the cabinet.
17 The connectors of the optical cables that are laid but not in use are covered with protective caps.
18 The signal cable of the alarm box laid on a wall is in a PVC trough. The extra part of the cable is coiled up and placed
beneath the floor beside the alarm box or on the cable ladder.
19 The signal cables are bound separately from the power cables.
20 The signal cables are bound and arranged neatly and closely. The cable ties are spaced evenly. The tips of the cable ties
point to the same direction.
21 The extra parts of the cable ties are fully cut off.
22 The identifiers (labels) attached to both ends of the signal cables are legible. They are attached neatly and point to the same
direction.
Checklist for signal cable Installation
www.huawei.com
Thank You