PLUMBING :
Plumbing is the
mechanism of the
disposal of waste
water of any
structure & the
supply of pure
water and gas .

PLUMBING INCLUDS :
Supply of pure water
Supply of gas
Disposal of human waste

& waste water

METALIC:

PLASTIC:

-GI Pipe

-UPVC

-Stainless steel

-CPVC

-Galvanized steel

-PVC

-Copper Pipe

-PPR

Used in pipe and


plumbing systems
to connect straight
pipe or tubing
sections.
To adapt to
different sizes or
shapes.

Regulating or
measuring fluid
flow.

ELBOW JOINT:

It is used to join 2 nonlinear pipes at a certain


angle

It is usually 90)

UNION:

It is used to join linear


pipes at 180 angle

It is usually threated on
both sides

TEE-JOINT:

T shaped.

Have two outlets, at


90 to the connection
to main line.
Used either to
combine or split a
fluid flow.

OFFSET:
It is used to
change the
direction of pipe.
It helps used to
bypass any
obstracle.

It is also used to
join two pipes from
different direction

PLUG & REDUCER:


Plugs are used to close off
the end of water pipes

Reducer is used to join


two pipes of different
diameter.

SUPPLY OF PURE
WATER

It includs the filling of


researver & watertank with
pure water and supply them to
houses.

Float
Valve

Gate
Valve
s

PRESSURE REDUCER
It is used to reduce the
pressure of falling water.
It is used for high
buildings.

WATER SUPPLY IS ENSURED


FOLLOWING STEPS:

Carry the water


to water tank

Filling the
resurver

Supply to all the


desired destination

The resurver is filled with water from main


supply line using a water pump.

Then the water is


carried to the
main water tank
using another
pump

Main pipe 2Dia

2 Riser pipe
2 Downfeed
pipe

2downfeed pipe

2 downfeed pipe
splits up into
2horizontal pipe

Gate valve

2 pipe
reduced to 1
pipe

Reducer

Disposal of human waste


Disposal of human
mud needs more
prececition , so this
disposal system is a
bit different from the
other.

A seal
to
remove
odor

A fitting

to
prevent odour
from sewer or
drain.
Mostly used:
i)P-trap
ii)S-trap
iii)Q-trap
S-Trap

Door seal:
Helps to
clean the
trap if
jammed.

P-Trap

Tee-joint

Waste water
stack

Rain water
downpipe

P-trap
False ceiling

soil stack with


P-trap

Waste stack with


basin or shower

Waste stack and soil


stack is bend to be
deposited into main
pit

Partition wall to hide


soil stack and rain
water pipe going to pit

Sewage pipes
that run from top
to bottom of a
building

Pipes
concentrated
into one place
to open in pit
downward

A slope is maintained from top pit to


main sewage line so that waste can move
due to gravity

Sewage line

CONNECTION OF GAS
Natural gas is not
available in most
of the countries .
So natural gas is
connected to
houses in gust a
few countries .
However it need to
be very careful of
gas connection.

GAS METER

REGULATOR

FINISHING INCLUDS
Plastering & Tilcing
Floor finishing
Coloring
Installation of door & window
Installation of Kitchen facilities
Installation of Washroom Facilities
Finishing Stairs

PLASTERING
Plastering means
the

TILCING

FLOOR FINISHING
It includes the
installation of
tiles or
muzaiking of
floor or using
granide to
some
particular
cases.

COLORING

INSTALLATION OF DOORS &


WINDOW

KITCHEN FACILITY

WASHROOM FACILITY

STAIRS FINISHING