DOCUMENTATION,
SMM
Contents:
Measurement process
Attributes of QS
Traditional preparation of BQ
Modern preparation of BQ
Standard Methods of Measurement
Attributes of a Quantity
Surveyor
Ability to describe clearly, fully and precisely the
requirements of the designers and arrange the
Bills of Quantities.
??????
The contractors estimator can
quickly, easily and accurately arrive
at the estimated cost of the work.
Attributes of a Quantity
Surveyor
How to
achieve
? precisely
Ability to describe
clearly,this
fully and
the requirements of the designers and arrange
the Bills of Quantities.
be
Divisions of bill
preparation
Development of bill
preparation
TOPIC:
Measurement & Bills of
Quantity
Main objective:
To produce the document for the list of quantities
(bills of quantity). The quantities meaning the
estimated amount of building works / trade works
for specific building elements.
Standard Methods of
Measurement for Building
Works (SMM)
Advantages of using BQ
According to Seeley (1997),
Disadvantages of using BQ
The
Client:
Client has intention to build buildingdeveloper, owner, funder, etc.
Contractor:
Contractor a person / company who has
expertise & experience to build building /
infrastructure
works,
water
and
sewerage system and install the
building services- electrical, mechanical.
of contract
Contract drawings
Specification
Preambles
Bills of quantities
Schedule of rates
Tendering
stage
POSTCONTRACT
(contract
signed and
the selected
contractor
started their
works till
completion
stage)
Constructio
n stage
Explanation
To enable the contractor to tender to a project
& price the described works.
To control in ordering materials and
assessing the labour requirement for the
contract.
Project
completed
similarities
Fixed
price/ lump
sum
Approximate
Drawings
and
specification
differences
Both the quantities and unit rates form
part of the contract
A detail breakdown of all the quantities is
shown in the BQ
The empty bill is supplied to the contractors
to tender / price the described works/ project.
The QS prepares BQ but subjected to later
adjustment.
Only unit rates form part of the contract.
The signing of the contract and beginning of
the project may proceed before the whole
design is complete.
The empty bill is supplied to the contractors
to tender / price the described works/ project.
The contractors are supplied with drawings
with full specifications.
No empty bill is supplied to the contractors.
The contractors prepare their own BQ.
Suitable for small project (less than
RM500,000)
of materials and
workmanship
Preambles (only in Bill of Approx Qtty)
Measured works bill
Schedules of rates (only in Bill of Approx
Qtty)
Preliminaries
It must:
Contain a definition of the scope of works and
details of the proposed form of contract /
project.
Contain a detailed description of the
administrative mechanism / temporary facilities
to implement the contract / project.
Contain list of drawings and any special
instructions to the contractor highlighting
the method of pricing and presenting tenders and
other site information.
Specification
A
Measured works
Preambles
Schedule of Rates
Divisions of bill
preparation
Description of works
Measuring /
taking-of
Working up /
squaring
Transfer to
abstract sheet
Billing
Preparation of billing
item
description
Qty
unit
rate
amount
1.0
320
NR
RM100.00
RM32,000.00
2.0
1,920
RM12.00
RM23,040.00
3.0
115
M2
RM18.00
RM2,070.00
4.0
M3
RM180.00
RM1,440.00
5.0
ITEM
RM1,800.00
RM180.00
Development of bill
preparation
SETTING DOWN
DIMENSION
Dimension Paper
Units of Measurement
Cubic measurement = m3
Square or superficial measurement = m2
Linear measurement = m
Enumerated items Nr/ Nos.
Items
Expressions of
Measurement / Rules in
setting down the
dimension
correcting
are
encourage.
It
with
fluid
not
is best to nil
entirely and write
out
again
the
dimensions.
Note:
Anding-on ,
deductions shall be
in similar form of
dimension.