Professional Documents
Culture Documents
Jianxu Zhou
Hohai University
Hydropower intake
A.4
Hydropower intake
A.5
2013 4
Hydropower intake
A.6
2013 4
Hydropower intake
A.7
2013 4
Hydropower intake
A.8
2013 4
Hydropower intake
A.9
Hydropower intake
A.10
2013 4
Hydropower intake
A.11
Hydropower intake
A.12
2013 4
Hydropower intake
A.13
Hydropower intake
A.14
Hydropower intake
A.15
2013 4
Hydropower intake
A.16
2013 4
Hydropower intake
A.17
2013 4
Hydropower intake
A.18
2013 4
Hydropower intake
A.19
2013 4
Hydropower intake
A.20
2013 4
Hydropower intake
A.21
2013 4
Hydropower intake
A.22
2013 4
Hydropower intake
A.23
Enough submergence
no vortex
Arrangement requirements Its top elevation is lower than the min. operating
water level, and has a certain submergence to avoid the funnel-shaped suction
vortex (controlling condition) and negative pressure in pressurized diversion
pipeline.
2013 4
Hydropower intake
A.24
suction
vortex
Empirical Formula:
Scr cV d
in which c is an empirical
coefficient c=0.55-0.73 small
values for symmetrical inflow large
*Fr meet
Fr V
g ( S cr d / 2)
0.23
2013 4
Hydropower intake
A.25
2013 4
Hydropower intake
A.26
Hydropower intake
A.27
Hydropower intake
A.28
Main types
(1) Side intake/outlet
The diversion pipeline
is nearly horizontal to
be connected with the
intake/outlet. The
intake/outlet is built
close to reservoirs side
slope with relatively
large structure and
excavation.
2013 4
Hydropower intake
A.29
2013 4
Hydropower intake
A.30
2013 4
Hydropower intake
A.31
2013 4
Hydropower intake
A.32
Hydropower intake
A.33
2013 4
Hydropower intake
A.34
2013 4
9. 2
9. 3
Hydropower intake
9. 4
439. 5
3457. 5
A.35
7. 4
1
G2
G1
240. 000
O2
7. 3
249. 000
O3
O
295. 000
7. 2
248. 000
2013 4
Hydropower intake
A.36
2013 4
Hydropower intake
A.37
2013 4
Hydropower intake
A.38
2013 4
Hydropower intake
A.39
2013 4
Hydropower intake
A.40
Case analysis:
2013 4
Hydropower intake
A.41
2013 4
Hydropower intake
A.42
2013 4
Hydropower intake
A.43
Local head loss coefficient of the intake/outlet under turbine and pump
mode:
(1) General description
The intake/outlet of the pumped storage power station is generally
made up of entrance section, trash rack, diffusion section, diversion
pier, transition section and connecting section, and some of the
intake/outlets also include gate shaft section. Generally, the pipe length
between diffusion section and gate shaft section is very short or they are
connected directly without connection section. Therefore, the head loss
of intake/outlet under inflow or outflow condition is defined as the total
head loss of all the sections of the intake/outlet.
2013 4
Hydropower intake
A.44
2013 4
Hydropower intake
A.45
2013 4
Hydropower intake
A.46
2013 4
Hydropower intake
A.47
2013 4
Hydropower intake
A.48
Lower reservoir
Pumpedstorage power
stations
Type
Inflow
Outflow
Inflow
Outflow
Side
0.22
0.26
Side
Side
0.34
0.39
Side
0.33
0.37
Side
0.19
0.39
Side
0.22
0.40
Side
0.25
0.33
Side
0.31
0.43
Side
0.19
0.48
Side
0.14
0.46
Side
0.33
0.58
Side
0.19
0.27
Side
0.14
0.46
Side
0.26
0.33
Side
0.27
0.54
Side
0.32
0.43
Side
0.21
0.33
Side
0.25
0.32
Side
0.18
0.42
Side
0.38
0.48
Side
0.21
0.67
Well-type
0.53
0.64
Side
0.23
0.33
Well-type
0.33
0.54
2013 4
Hydropower intake
A.49
Hydropower intake
A.50
2013 4
Hydropower intake
A.51
Hydropower intake
A.52
2013 4
Hydropower intake
A.54
2013 4
Hydropower intake
A.55
In order to guarantee the safe and reliable operation of the pumpedstorage hydropower stations, to set anti-vortex beams above the
intake/outlet is commonly used to prevent the inflow vortex. From the
effectiveness of anti-vortex beam, to set the floating mats is the best
choice, however, because the floating mats are easy to be affected by
floating debris and its structure is relatively complex, the anti-vortex
beams are often used instead of the floating mats.
2013 4
Hydropower intake
A.56
Case analysis:
2013 4
Hydropower intake
A.57
2013 4
Hydropower intake
A.58
2013 4
Hydropower intake
A.59
2013 4
Hydropower intake
A.60
2013 4
Hydropower intake
A.61
2013 4
Hydropower intake
A.62
2013 4
Hydropower intake
A.63
anti-vortex beams.
Intake/outlet height original 12.2m final 9.9m
Intake/outlet width original 42.6m final 28.5m
Horizontal diffusion angle original 39.6 final 44.9
Length of diffusion section original 44.5m final 22.9m
2013 4
Hydropower intake
A.64
2013 4
Hydropower intake
A.65
Lower reservoir
PSP
Dimension of trash
rack (m2)
Velocity
(m/s)
PSP
Dimension of trash
rack (m2)
Velocity
(m/s)
4510.0
1.01
24.87.0
1.0
45.09.0
0.90
44.510.8
0.83
47.513.0
0.72
47.513.0
0.72
45.08.5
0.82
45.510.0
0.62
45.09.5
0.99
34.56.5
0.62
44.09.75
0.77
44.56.67
0.90
24.04.9
1.0
46.2515
0.89
47.516.0
0.96
45.510.0
0.8
4715.0
0.77
33.44.5
0.8
28.211.5
29.011.5
0.69
10
2013 4
Hydropower intake
A.66
2013 4
Hydropower intake
A.67
2013 4
Hydropower intake
A.68
2013 4
Hydropower intake
A.69
2013 4
Hydropower intake
A.70
2013 4