You are on page 1of 20

Power Tarif

2012-13
with
Import bill of
2011-12

Main Constituents of
APEPDCL Power Tarif

Maximum Demand (MD)

Contracted MD (CMD)
Recorded MD (RMD)
Billing Demand (BD)

Gross Energy in kVAh


Electricity Duty Charges
Fuel Surcharge Adjustment (FSA)
Other Charges

For Definitions see Appendix.

Salient Features
Energy
Consumption
computation
based on kVAh in place of kWH.
As the kVAh is vector sum of kWH and
kVARh, it represents Total Energy
consumption.
kVAh based energy billing encourages
consumers to consume at possible
higher power factor.
Clause on surcharge due to low power
factor removed.

Agreement for
Import
of
Power
Contracted MD = 135 MVA
Energy Charges ---- Three parts
General Industrial load
Lighting & fan load in factory, if not
segregated, 15 % of total energy accounted
as lighting & fan load in factory
Colony Consumption, if not segregated, 15
% of total energy accounted as Colony
consumption
Electricity Duty as applicable
Fuel Surcharge Adjustment as applicable
Other Charges - Lumpsum

APEPDCL Power Tarif


Demand charges @ Rs. 250 per KVA
( Rs. 2.50 lakhs per MVA )
Billing MD = RMD or 80 % of CMD whichever
is higher. For excess
Demand charges
Energy charges
RMD as % of CMD on demand
on full energy
exceed

100 % to 120 %

2 times of normal
charge

Normal charges

Above 120% & up to


200%

2 times of normal
charge

1.15 times normal


charges

More than 200 %

2 times of normal
charge

1.2 times normal


charges

APEPDCL Power Tarif


ENERGY CHARGES
Actual Colony Consumption @
Rs.4.50 per kVAh unit
85 % balance Energy @ Rs.3.97 per
kVAh unit towards industrial load
15 % balance Energy @ Rs.5.67 per
kVAh unit towards lights & fan load in
factory
TOD tarif (from 6 pm to 10 pm) :
additional @ Rs. 1.00 per kVAh unit

APEPDCL Power Tarif


Electricity Duty :
As per provisions of AP Electricity
Duty Act
At present
Electricity Duty is @ 6 paise per kVAh
on billed energy import.

APEPDCL Power Tarif


Fuel Surcharge Adjustment ( FSA ) or Fuel
Cost Adjustment (FCA)
To adjust the increase / decrease fuel
expenses over a base reference value.
As notified by APERC commission from
time to time
Applicable to all categories except
agriculture

Other Charges (Lumpsum) Rs.2250 /-

APEPDCL Power Tarif


Charges for delay in Payment
of Electricity Bill after 15th of
every month :
1.5% of bill amount or Rs.550,
whichever is higher

Comparison of Tarif
Description

2011-12 tarif

2012-13 tarif

MD Charges

Rs.250 /kVA/Month

Rs.250 /kVA/Month

Industrial
consumption

Rs.2.97/ kVAh

Rs.3.97/ kVAh

Light & Fan


consumption in
factory

Rs4.67/ kVAh

Rs5.67/ kVAh

Colony
Consumption

Rs4.50/ kVAh

Rs4.50/ kVAh

TOD (18.00 to
22.00 hrs.)
consumption

Rs1.00/ kVAh

Rs1.00/ kVAh

Electricity Duty
Charges

@ 6 paise/ kVAh

@ 6 paise/ kVAh

Energy Rate 2011-12


Effective
Rate

Description
85% of energy import
@2.97/unit =
towards Industry
15% of energy import
@4.67/unit =
towards Light & fans
Electricity duty rate
Total Energy charges
rate basic

@0.06/unit =
=

2.525

per
unit

0.701

per
unit

0.060

per
unit

3.285

per
unit

Energy Rate 2011-12


Description

Effective
Rate

Additional charges During TOD


@1.00/
period (peak hours i.e.) between
=
unit
18.00 hrs to 22.00 hrs
Total Energy charges rate during
TOD period (peak hours)
Assuming power import is
uniform, the effective additional
TOD charges
Average Energy rate including
TOD charges

=
=

1.000

per
unit

4.285

per
unit

0.167

per
unit

3.452

per
unit

Energy Rate 2012-13


Description
85% of energy import
towards Industry
15% of energy import
towards Light & fans
Electricity duty rate
Total Energy charges
rate basic

Effective
Rate
@3.97/unit =
@5.67/unit =
@0.06/unit =
=

3.375

per
unit

0.851

per
unit

0.060

per
unit

4.285

per
unit

Energy Rate 2012-13


Description
Additional charges During
TOD period (peak hours i.e.)
between 18.00 hrs to 22.00
hrs
Total Energy charges rate
during TOD period (peak
hours)
Assuming power import is
uniform, the effective
additional TOD charges
Average Energy rate including
TOD charges

Effective
Rate
@1.00/
=
unit

=
=

1.000

per
unit

4.285

per
unit

0.167

per
unit

4.452

per
unit

Import Bill Details of VSP for


the Year 2011-12 is shown for
reference in the following slides.

Import Bill Details 201112


Month

RMD
in
MVA

Import in
MVAH

Bill Amount
(in Lakhs)

April

108.0

16642

898

May

168.4

36710

2036

June

139.2

25996

1324

July

120.4

26460

1277

August

116.8

30880

1422

September

134.4

38854

1737

Import Bill Details 201112


Month

RMD in
MVA

Import in
MVAH

Bill Amount
(in Lakhs)

October

114.8

30280

1388

November

115.2

20858

1054

December

138.80

18634.0

1047.20

January

100.40

24402.0

1163.73

February

111.60

16394.0

894.52

March

149.20

24354.0

1310.75

310464.0

15555.2

Total

Appendix
Maximum Demand, MD
The maximum demand of supply of electricity to
a customer during a month shall be 4 times the
largest number of kilo-Volt-Ampere-Hours(kVAh)
delivered at the point of supply to the consumer
during any consecutive 15 minutes in the month
for the consumers having contracted demand
above 4000 kVA(VSPs contracted demand is
135 000 kVA).

Billing Demand, BD
The Billing Demand shall be the
maximum demand recorded during
the month or 80% of the contracted
demand whichever is higher(Minimum
Billing Demand for VSP is 1 08 000
kVA).
Recorded Maximum Demand, RMD
The RMD shall be the maximum
demand recorded during the month.

Fuel Surcharge Adjustment, FSA


FSA is based on variance in the
average fuel input cost for generating
electricity by all the generating stations.
It is applicable as per the Regulations
notified by the Commission from time to
time.