You are on page 1of 80

GD-10 D.C.

GEO-ELECTRICAL
SYSTEM

Quick Start

Built for
Field

ST Geomative Co., Ltd


www.geomative.com
2016.6.26

Content

1. Overview of GD-10 system

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content

1.1 GD-10 Mainframe

LCD Screen

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Control
Panel
Portable
Handle

Knob:
Shortcut Button:
Turn Left Down
F1, F2, F3, F4
Turn Right Up
Press - Enter

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

Left Side
Panel

Nameplate

Charging/E
xternal
Battery
Interface

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
Interface
6.3 Output RES2D Data
6.4 Add Terrian Data
for ground
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Function Button:
Page Up
Menu
Back
Page Down

Power
Switch
USB Interface

Positive/Neg
M (P1) and N
ative
(P2)
Interface for
interface
Input
Interface
for A (C1)
and B
(C2)

Right Side Panel

Interface for

Fuse Box
MultiST Geomative Co., Ltd
cable www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

1.1 GD-10 Mainframe Control Panel


Control
Panel

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Using shortcut button to switch the items on the


bottom of screen, F1~F4 will have different
functions in different menu.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1.1 GD-10 Mainframe general parameters


Transmitting Channel
Max. Power (W)

7200

Max. Voltage (V)

1200

Max. Current (A)

Protection

Over current and short-circuit

Pulse Duration (S)

1, 2, 4, 8, 16, Selectable

Accuracy

0.1% 1uA

Input impedance

50M

Potential Channel
Potential Range (V)

24

Accuracy

0.05% 1uV

SP compensation range

10V

Suppression

95dB, for 50Hz or 60Hz selectable

General
LCD Screen

480x272, full color

Memory Storage

4G Byte

Battary

12V, 7.8Ah Li-Ion Battery

External DC Power

12V ~ 60V

Working temperature

-10~+55

Storage temperature

-30~+60

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

1.2 CL-10 Bi-directions Intelligent Cable Leader

CL-10 Cable leader is used in 2D or 3D ERI electrical


measurement. It is used as a switcher and repeater. One cable
leader can control the cables on the both sides.

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Length: 300mm
Diameter: 65mm
Weight: 1Kg
Material: aluminum alloy
Protection level: IP66
Working battery: 5200mAh

Generally, we
put
cable
leader
inside
the winch to
protect it.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

1.3 12 Take-outs Bi-directions Multicore Cable


12 take-outs ERI cable is used to connect electrodes , transmittingand receiving
signal.

2. Registration

For each take-out there are two joints. These two joints are separated, they are

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management

controlled by two different cable leaders on each side.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Take-outs: 12
Cores: 26pins
Cable spacing: 5m, 10m or Custom
Weight/length 5m spacing - 6Kg/65m
10m spacing - 11Kg/130m
Waterproof: IP66

ST Geomative Co., Ltd


www.geomative.com

Content

1.4 Winch and Starlike Electrode

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

Usage of winch:
Carry cable and cable leader,

2. Registration

Layout cable,

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management

Protect cable leader.


Wight :

4. Upload files to GD-10 Mainframe

Net Weight - 1.5Kg

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

With 5m spacing cable 7.5Kg


With 5m spacing cable 11.5Kg

Launch the electrodes and the


receiving electrode resistivity
method
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

1.5 BP-145 DC Rechargeable Power Source

BP-145 is a digital DC rechargeable power source, it is designed for field work.

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

Parameters
Output Voltage: 48V 96V 144V
Max Output Current: 2A
Charging Voltage: 100V ~ 240V
AC

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data

Output Pattern: DC output

Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Store Temperature: -30/+60

Working Temperature: -20 ~


+60
Capacity: 2 AH with 48V output is
6AH

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

2. Registration
2.1 Connect GD-10 and Geomative Software
a. Connect GD-10 with PC;
b. Start Geomative on PC;
c. There will be a message come out;
d. Select OK, GD-10 and Geomative have been
connected;

2.2 Register Geomative Software

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Wait a few seconds, finish


registration.

a. Select Manage Device Main View to


enter to the main page of divice
management;
b. Select the serial number of this new
device under New device;
c. Right click to open the menu;
d. Select Register device to register GD10 on Geomative;

The GD-10 which has been


ST Geomative Co., Ltd
registered is in the Registered
www.geomative.com
device list.

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

2. Registration
2.3 Modify parameter of GD-10

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

1. Select the registered

4. Upload files to GD-10 Mainframe

GD-10, right click to

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

open the menu;

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

2. Select Modify
parameter, there will
be an window come
out;
3. Modify the parameters
for GD-10 in this
window;
4. Select OK to save the
parameters.ST Geomative Co., Ltd
www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

Preparation on Geomative Studio


Start Geomative Studio Software on PC

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

3. Operation of Geomative Studio


3.1 Project Management
SelectManage

Project Main view


to enter to the Home
Page
of
Project
Management.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Home Page of Project Management

ST Geomative Co., Ltd


www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.1 Project Management


create New Project

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Select Manage Project Operate


Create project locally in the
toolbar

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Create project locally in


right-click menu
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

3. Operation of Geomative Studio


3.1 Project Management
set Project Parameters

1. Project ID - Press
New, Geomative will
automatically
generate a Project
ID,
2. Input Project Name,
3. Input Project
Location,
4. Select Create Date,
5. Input Duration Days,
6. Input Project
Supervisor,
7. Input On-site
Manager,
8. Input Project
Manager,
9. Input QA,
10.Input Standard,
11.Input Remark
Information,
ST Geomative Co., Ltd
www.geomative.com
12.Press OK
to save

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

3. Operation of Geomative Studio


3.1 Project Management Delete Project
Select Manage
Project Operate
Delete
local
project
in
the
toolbar

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

Select Yes to delete the project

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Delete local


project in right-click
menu

Warning:
The deleted project can not be
recovered;
When you delete a project, the test
zones and data files in the
project
ST Geomative
Co., Ltd
will be deleted, too.
www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.1 Project Management Create New Test Zone


Select
Manage

Project Operate
Create zone locally in
the toolbar

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Create zone locally


in right-click menu
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

3. Operation of Geomative Studio

3.1 Project Management Set Parameters of Test Zone

1.

Input Zone
name,

2. Select Creation
Date,
3. Input Zone
Location,
4. Input Remark
Information,
5. Select OK to
save New Zone.

ST Geomative Co., Ltd


www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe

3.1 Project Management Delete "Test Zone


Select Manage

Project

Operate Delete
local zone in
the toolbar

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Delete local zone in


right-click menu

Select Yes to delete the test


zone
Warning:
The deleted test zone can not be
recovered;
When you delete a test zone, the
data files in the test zone will be
ST Geomative Co., Ltd
deleted, too.
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

3. Operation of Geomative Studio


3.2 Script Management
SelectManage

Script Main view


to enter to the Home
Page
of
Script
Management.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Home Page of Script Management

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

3. Operation of Geomative Studio


3.2 Script Management create 1D new script

Select Manage
Project Operate
Create New Script in
the toolbar

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Create New


Script in right-click
menu
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management
general parameters of 1D script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1. Input Script Name,


2. Input Operator,
3. Select Creation date,
4. Input Remark Information.
Note: The item with * in front is required.

ST Geomative Co., Ltd


www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.2 Script Management 1D VES script (4P VES array)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1.
2.
3.
4.
5.
6.

Input a = 1/2 * AB,


Input b = 1/2 * MN,
Select Iteration number: 1~100,
Select Add to add one record,
Select Update to replace the selected record,
Select Delete to delete the selected record.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management 1D VES script (Dipole-dipole array)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1. Input a = AB = MN,
2. Input b = OO,
3. Select Iteration number: 1~100,
4. Select Add to add one record,
5. Select Update to replace the selected record,
6. Select Delete to delete the selected record.
ST Geomative Co., Ltd
www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.2 Script Management 1D VES script (3P VES array)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1.
2.
3.
4.
5.
6.

Input a = OA = OB,
Input b = 1/2*MN = OM = ON,
Select Iteration number: 1~100,
Select Add to add one record,
Select Update to replace the selected record,
Select Delete to delete the selected record.

ST Geomative Co., Ltd


www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.2 Script Management 1D VES script (RECTGL array)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1.
2.
3.
4.
5.
6.
7.
8.
9.

Input a = 1/2 * AB,


Input b = 1/2 * MN,
Input Gridding x*y,
Input Row Spacing,
Input Col Spacing,
Select Iteration number: 1~100,
Select Add to add one record,
Select Update to replace the selected record,
Select Delete to delete the selected record.
ST Geomative Co., Ltd
www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.2 Script Management 1D VES script (Custom array)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1.
2.
3.
4.
5.
6.
7.
8.
9.

Input a,
Input b,
Input x,
Input y,
Input K,
Select Iteration number: 1~100,
Select Add to add one record,
Select Update to replace the selected record,
Select Delete to delete the selected record.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

3. Operation of Geomative Studio


3.2 Script Management create 2D new script

Select Manage Script


Operate Create New
Script in the toolbar

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Create New


Script in right-click
menu

ST Geomative Co., Ltd


www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3.2 Script Management set parameter for 2D


Script
Parameters of
Script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Script
displayed in
form

Script display by
image
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management general parameter of 2D Script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1. Input Script Name,


2. Input Operator,
3. Select Creation date,
4. Input Remark Information.
5. Select Electrode number,
6. Select Array,
7. Press OK to generate preview script.
Note: The item with * in front is required.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration

3. Operation of Geomative Studio


3.2 Script Management choose the 2D Script you need
Select points in the form by add in front of the point.

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select points in the image, the selected points will turn to green.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management modify iteration of 2D Script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Select Modify iteration


number in right-click menu.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Effective range:
Current point,
Current layor,
Current and all below layors,
Current and to specified layers
Iteration number 1~100 times
selectable
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management available arrays of 2D Script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

There are 6 kinds of 2D arrays available in Geomative now.


1. Wenner
2. Wenner
3. Wenner
4. A array ;
5. B array;
6. Schlumberger.
Note: There will be more arrays can be used for GD-10 in the
future, we will update Geomative continuously.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management


available arrays of 2D Script (Wenner )

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

AM=MN=NB
k=2a MN=a

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management


available arrays of 2D Script (Wenner )

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

AB=BM=MN
k=6a AB=BM=MN=a

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management


available arrays of 2D Script (Wenner )

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

AM=MB=BN
k=3a AM=MB=BN=a

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management


available arrays of 2D Script (A array)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

B to infinity

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

AM=MB=BN
k=4a

AM=MN=a

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management


available arrays of 2D Script (B array)

2. Registration

A to infinity

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

MN=NB
k=3a

MN=NB =a

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio

3.2 Script Management


available arrays of 2D Script (Schlumberger)

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

AM=MN=NB
k=3a AM=NB=na, MN=a

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management Delete Script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Manage Script Operate Delete


script in the toolbar.

Select Delete script in the


right click menu.

Select Yes to delete the


script.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

3. Operation of Geomative Studio


3.2 Script Management Create 3D new Script
Select Manage Script
Operate Create New
Script in the toolbar

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Create New


Script in right-click
menu
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management General Parameters of 3D Script

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

1. Input Script Name,


2. Select Creation date,
3. Input Remark Information.
4. Input Operator,
5. Select Array,
6. InputElectrode number X,
7. InputElectrode number Y,
8. Input"gradient Pos in X",when Array select "gradient".
9. Input"gradient Pos in Y",whenArray select "gradient".
10.Press OK to generate preview script.
Note: The item with * in front is required.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

3. Operation of Geomative Studio


3.2 Script Management Available Arrays of 3D Script
There are 7 kinds of 3D arrays available in Geomative now.

2. Registration

1. Pole-Pole

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management

2. Pole-Dipole

4. Upload files to GD-10 Mainframe

4. Schlumberger ;

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

5. WennerAlfa;

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

3. Dipole-Dipole

6. WennerBeta
7. Gradient.

Note: There will be more arrays can be used for GD-10 in the
future, we will update Geomative continuously.

ST Geomative Co., Ltd


www.geomative.com

Content

3. Operation of Geomative Studio

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration

3.2 Script Management details of 3D Script

Script Name

Script Type

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Script properties

Script details

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

4. Upload files to GD-10 mainframe


4.1 Synchronization GeomatIve Studio and GD-10 Mainframe
1. Connect GD-10 and computer by communication cable,
2. Start Geomative and power on GD-10,
3. Wait for a few seconds, Geomative shows a message Find GD-10
on com ,
4. Wait for another few seconds, Geomative is synchronization data
from GD-10 (in these few seconds, please dont control Geomative),
5. Select Function Synchronization to enter to the GD-10
management page on Geomative.

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

4. Upload files to GD-10 mainframe


4.2 Upload Project and test zone
1.Select device in the list, then
the data files in GD-10 will
show in the synchronization
window.

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

2. Press New project to enter


to the project and test zone
list in Geomative;

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

3. Select the Project and Test Zone which you


want to upload;
Note: You can not upload empty project
into GD-10, which means there should be
at least one test zone under the project.
4. Select OK to start uploading Project and
Test Zone.
Note: It will take few seconds to upload
each Project and Test Zone, please wait.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

4. Upload files to GD-10 mainframe

4.2 Upload Project and test zone

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe

Select the device again to refresh

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

the status of GD-10, then you can

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

see the new project and test zone


in the list.
If you want to see the new project
in GD-10, please restart GD-10 to
refresh the list, then you can check
the projects, test zones which you
uploaded in the GD-10.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

4. Upload files to GD-10 mainframe

4.3 upload script


Select Script to enter to the script uploading page.
There are two list of script:
The first list Script in local shows the scripts in geomative,
The second list Script in device shows the scripts in GD-10.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

4. Upload files to GD-10 mainframe

4.3 upload script


Select the scripts which you want to upload in Script in local,
Click Download to download them to GD-10,
Check the script in GD-10.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
1. Power on GD-10 by

2. Registration

switching the switcher on

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management

left panel.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

2. The LCD screen will


show the boot screen for
about 3s;

3. It will turn to the main


page

of

management

Project
after

boot

screen.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

5. Operation of GD-10 Mainframe


5.2 Device management
Press F2 to enter home
page

of

device

management.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select device, enter to


the device and view the
specification of your
device.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.2 Device Management
Press "F2 to enter to " environmental parameters" page.
In " environmental parameters" page, you can set environmental
parameters.
Before
measurement,
please set the environment
parameter.
The items with in the
end means there are some
selectable options for it.
The items with in the
end means you can type
something you want for it.

Note:
Please fill the environment parameter as detailed as you can,
it will be very helpful for the after work.
Especially the electrode spacing, please set it before create
new measurement. If not, the Ro will be wrong.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration

5. Operation of GD-10 Mainframe


5.2 Device Management - set environmental parameters
Press Menu, then select Update device to connect GPS and refresh the
status of GD-10.

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe

Select Cable-layout

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

parttern,

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Input Electrode step,


Input Electrode spacing,
Input Weather,
Input Wind,
Input Temperature,
Input Humidity,
Set Max Rg.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

5. Operation of GD-10 Mainframe


5.3 Create new measurement

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Back

to

the

project

main

page.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select project, press "Menu"


to show the pop-up Menu.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

5. Operation of GD-10 Mainframe


5.3 Create new measurement
In the menu select "new test" to show the "new test" attribute editor page.

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

Set "new testing"


parameters
- Name
- Zone
- Site
- Script
- Method
- Waveform

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data

- Frequency

Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

-Operator

- Sample rate
-Mode
- QA

ST Geomative Co., Ltd


www.geomative.com

Content

5. Operation of GD-10 Mainframe

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

Press F4 to save the measurement which you created

2. Registration

If you created a VES task, it will be saved in the VES list,

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management

If you created a ERI task, it will be saved in ERI list.

5.3 Create new measurement - Save new measurement

You can view the new task in the task list.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe

5. Operation of GD-10 Mainframe


5.4 Get GPS Coordinates
1.
2.
3.
4.
5.

Enter to the main page,


Press "F2" into the "device management" interface,
Press "F2" into the "environment parameter" interface,
Press "Menu" to show the menu,
Select "update device", GD - 10 began to search the GPS signals,
the coordinates for the GD-10
6. If search signal failed, then repeat the operation of 4, 5.

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

5. Operation of GD-10 Mainframe


5.5 1D VES Measurement

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Select the measurement you


want in VES list.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Press Knob to enter to the


measurement and view the
parameters
of
the
measurement, to make sure
all the parameters are OK.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration

5. Operation of GD-10 Mainframe


5.5 1D VES Measurement
Press "F3" into the "data
detail " page.

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select the point you want,


then press F4 to measure
this point,
Turn the knob to choose
next point, continue to
measure,
Test each measurement
data points on the list, until
the VES is finished.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.5 1D VES Measurement

If the repeated measurement


of a point, the point will
generate a plurality of data;
Each measurement data is
automatically saved, after
the measurement of direct
exit.

Select a measurement point,


press the "knob", enter the
point data detail page, view
the details of the data point.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement- Layout
Inject the electrodes in to
the ground.
Layout the cables by
using the winches.
Connect the electrodes to
the cable take-outs.
Note: Please connect to the
side which is nearer to the
GD-10 main frame.
Connect the cables and
cable leaders.
Note: The input side of
cable leader (with a GD10 mark on the side)
should be close to GD-10
main frame.

The
electrode
should be connected
to the side which is
nearer to the GD-10
main frame.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement - Check cable leader
Select Device Cable
Head, to renew the status of
cable leader.
You can check if every cable
leader is connecting well. If
not, you can check the wrong
connection point in time.
Select update equipment
state in the right click menu.
Note: Check the internal
power for each cable
leader, make sure that the
voltage of each cable
leader is higher than 7.2V,
better to make the voltage
higher than 7.5V.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement - Measure RG
Get latest data Refresh Rg,
Pre cable measure the Rg of
previous cable,
Next cable measure the Rg of
next cable,
Remeasure current cable,
Remeasure electrode,
Remeasure faulty electrode,
Remeasure all,
Measure the Rg (Grounding
Resistivity) to make sure that all
the electrodes are in the good
connection with the ground.
If the Rg is high than the Max Rg
which you set in the enviroment
parameters, there will be a * in
front of the electrode, that means
there are some bad connection for
that electrode, then you need to do
something with that to reduce the
ST Geomative Co., Ltd
Rg.
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement
Enter to the main page;
Select project in the project list, press the knob into project;
Press "F2" into the test zone list;
Select test zone in the test zone list, press the knob into the test
zone;
Press F3 to enter to the ERI list;

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Select the measurement you


want in ERI list.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Press Knob to enter to the data


point and view the parameters
of the data point, to make sure
all the parameters are OK.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

Press F3 to enter to data detail.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Press
Menu
and
select
the
measurement way you want:
Re-measure cur measure the
current point,
Continue

continue
the
measurement from current point,
Re-measure all measure all the
points.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management

5. Operation of GD-10 Mainframe


5.6 2D ERI Measurement
If you want to stop the measurement, please press Back, then
wait for few seconds until screen shows measure has been stopped.
Then you can operate GD-10.

4. Upload files to GD-10 Mainframe


5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

When the measurement is finished, GD-10 will save the data


automatically.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.7 3D Measurement- Check cable leader

Select Device Cable Head, to


renew the status of cable leader.
You can check if every cable leader
is connecting well. If not, you can
check the wrong connection point in
time.
Select update equipment state in
the right click menu.
Note: Check the internal power
for each cable leader, make sure
that the voltage of each cable
leader is higher than 7.2V,
better to make the voltage
higher than 7.5V.

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

5. Operation of GD-10 Mainframe


5.7 Measure for 3D - Measure RG
Get latest data Refresh Rg,
Pre cable measure the Rg of
previous cable,
Next cable measure the Rg of
next cable,
Remeasure current cable,
Remeasure electrode,
Remeasure faulty electrode,
Remeasure all,
Measure the Rg (Grounding
Resistivity) to make sure that all
the electrodes are in the good
connection with the ground.
If the Rg is high than the Max Rg
which you set in the enviroment
parameters, there will be a * in
front of the electrode, that means
there are some bad connection for
that electrode, then you need to do
something with that toSTreduce
the
Geomative
Co., Ltd
Rg.
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe

5. Operation of GD-10 Mainframe


5.7 Measure for 3D
Enter to the main page;
Select project in the project list, press the knob into project;
Press "F2" into the test zone list;
Select test zone in the test zone list, press the knob into the
test zone;
Press F4 to enter to the ERI list;

5. Operation of GD-10 Mainframe


5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

6. Data Management
6.1 Download data to database

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Enter to the synchronization page as we did when upload data from


Geomative to GD -10.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

6. Data Management
6.1 Download data to database

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Enter to the project test zone you want, the measurement files
will show in the right box test data in device.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

6. Data Management
6.1 Download data to database

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select the measurement files in the box test data in device which
you want to download.
Press Add, the measurement files will show in the below box test
data to be uploaded
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

6. Data Management
6.1 Download data to database

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select the files which you want to download in the box test data
to be uploaded, select upload, then wait for few seconds, the
data is loading. When the data loading is finished, the box test
data to be uploaded will become empty.
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration

6. Data Management
6.2 View the data file in the database
Go to the project management page, you can view the data files in the
database in the right box.

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source
2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement

6. Data Management
6.3 Output RES2D Data
Choose to output data file,
Right-click to show the menu,
Select Export DAT, there will be
a massage,
If you dont want to add terrian
data, select No.
If you want to add terrian data,
select Yes, then go to next page.

6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

6. Data Management
6.4 Add terrian data

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Select Distance type,


Input Distance,
Input Elevation,
Select Insert to add one
record,
Select Update to replace the
selected record,
Select Delete to delete the
selected record,
Select the serial number of
first electrode,
Select OK to save the terrian
data.

ST Geomative Co., Ltd


www.geomative.com

Content

Appendix 1 Charging

1. Overview of GD-10 system


1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

Charging GD-10 Mainframe

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Charger GD-10 BC-121

Power 110220V

GD-10
1. Connect the charger to the interface on the Left-side Panel and
power source,
2. Turn on the Charger GD-10, charging is beginning,
3. The indicator light on charger GD-10 should be red in the
charging,
4. After indicator light on charger GD-10 turned green for 3 hour,
the GD-10 is full charged
ST Geomative Co., Ltd
www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

Appendix 1 Charging
Charging CL-10 cable leader

2. Registration
3. Operation of Geomative Studio
3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Charger GD-10 BC-121

Power 110220V

1. Connect the charger to the cable leader,


2. Turn on the Charger GD-10, charging is beginning,
3. The indicator light on charger GD-10 should be red in the charging,
4. After indicator light on charger GD-10 turned green for 3 hour, the
GD-10 is full charged

ST Geomative Co., Ltd


www.geomative.com

Content
1. Overview of GD-10 system
1.1 GD-10 Mainframe
1.2 CL-10 Cable Leader
1.3 12 Take-outs Cable
1.4 Winch and Starlike Electrode
1.5 BP-145 DC Power Source

Appendix 1 Charging
Charging BP-145 Power Source

2. Registration

AC Power

3. Operation of Geomative Studio


3.1 Project Management
3.2 Script Management
4. Upload files to GD-10 Mainframe
5. Operation of GD-10 Mainframe
5.1 Start GD-10 Mainframe
5.2 Device Management
5.3 Create New Measurement
5.4 Get GPS Coordinates
5.5 1D VES Measurement
5.6 2D ERI Measurement
5.7 3D Measurement
6. Data Management
6.1 Download Data to Database
6.2 View the Data File in the Database
6.3 Output RES2D Data
6.4 Add Terrian Data
Appendix 1 Charging
* Charging GD-10 Mainframe
* Charging CL-10 Cable Leader
* Charging BP-145 Power Source

Dedicator

110~240V

1. Connect the charger to the interface on the Left-side Panel and


power source,
2. Turn on the BP-145, charging is beginning,
3. The dedicator on charger should be red in the charging,
4. After the dedicator on charger turned green for 1 hour, the BP-145 is
full charged.
ST Geomative Co., Ltd
www.geomative.com

You might also like