Topics
Planning & Control:
Project
Management (part 2)
Introduction
Project Scheduling*
PERT
& CPM
Project Crashing
Gantt Charts
The Gantt chart provides an overview for the Project Manager to allow them to
monitor project progress against planned progress and so provides a valuable
information source for project control.
Network techniques
Developed in 1950s
PERT by Booz, Allen & Hamilton with the U.S. Navy, for Polaris missile
(1958)
2.
3.
4.
5.
Compute the longest time path through the network this is called the
critical path
6.
Use the network to help plan, schedule, monitor, and control the
project
Activity
Description
Immediate
Predecessors
A, B
D, E
F, G
Description
Build internal components
Modify roof and floor
Construct collection stack
Pour concrete and install frame
Build high-temperature burner
Install pollution control system
Install air pollution device
Inspect and test
Total Time (weeks)
Time (weeks)
2
3
2
4
4
3
5
2
25
Earliest Start
Latest Start
Earliest Finish
ES
EF
LS
LF
Latest Finish
Activity Duration
Forward Pass
Begin at starting event and work forward
Earliest Start Time Rule:
If an activity has only a single immediate predecessor, its ES
equals the EF of the predecessor
If an activity has multiple immediate predecessors, its ES is the
maximum of all the EF values of its predecessors
ES
EF = ES + Activity time
Start
Start
EF of A =
ES of A + 2
2
0
Start
0
0
B
3
2
0
Start
= Max (2, 3)
D
3
B
3
2
0
Start
0
0
B
3
D
4
2
0
Start
13
4
0
B
3
D
4
H
2
G
5
13
15
Backward Pass:
2
0
Start
3
4
13
13
4
0
B
3
LS
=DLF 7 Activity time
3
G
5
H
2
13
LF = EF
of Project
15
15
2
0
Start
10
F
3
7
13
E
4 of following
8 activity)
LF = Min(LS
13
13
4
0
B
3
D
4
G
5
13
H
2
15
15
2
0
Start
C
2
10
4
4
0
0
B
3
D
4
E
4
F
3
7
13
13
13
8
8
G
5
13
13
H
2
15
15
Start
A
2
C
2
10
0
1
B
3
D
4
E
4
F
3
7
13
13
13
G
5
13
13
H
2
15
15
Slack = LS ES
or
Slack = LF EF
0
0
2
3
4
4
8
13
Earliest
Finish
EF
Latest
Start
LS
Latest
Finish
LF
2
3
4
7
8
7
13
15
0
1
2
4
4
10
8
13
2
4
4
8
8
13
13
15
Slack
LS ES
0
1
0
1
0
6
0
0
On
Critical
Path
Yes
No
Yes
No
Yes
No
Yes
Yes
Start
A
2
C
2
10
0
1
B
3
D
4
E
4
F
3
7
13
13
13
G
5
13
13
H
2
15
15
Advantages of PERT/CPM
1.
2.
3.
4.
Critical path and slack time analyses help pinpoint activities that
need to be closely watched
5.
6.
7.
PERT is very similar to Critical Path Method (CPM) but also uses
three time estimates for each activity:
2.
3.
4.