PRESENT STATUS OF
TEMBHU LIFT IRRIGATION PROJECT

TEMBHU LIFT IRRIGATION PROJECT

HIS HIGHNESS GOVERNOR OF MAHARASHTRA

VISIT TO SANGLI DISTRICT

Tembhu Barrage Across River Krishna

TEMBHU BARRAGE

Tembhu Barrage
Gate Erection
Pylon Structure
End View

Pump House - I A

INTRODUCTION

NO MAJOR DAM ACROSS KRISHNA & KOYNA


RIVER DOWN STREAM OF DHOM & KOYNA DAM.
WATER UTILISATION IS NECESSARY.
NO NATURAL SITE FOR GRAVITY DAM IS
SUITABLE, HENCE TEMBHU LIFT IRRIGATION
SCHEME IS TAKEN UP.
IRRIGATION POTENTIAL TO THE EXTENT OF
79,600 HA. WILL BE CREATED FROM DROUGHT
PRONE AREA OF SATARA, SANGLI AND
SOLAPUR DISTRICTS.

Contd.

INTRODUCTION

UTILISATION OF 22 TMC WATER.


79,600 HA. AREA OF 6 TALUKAS FROM
3 DISTRICTS WILL BE IRRIGATED.
(600 HA. FROM SATARA, 59,000 HA. FROM
SANGLI AND 20,000 HA. FROM SOLAPUR)

ESTIMATED COST OF THE


PROJECT - RS.1416.59 CRORES.
EXPENDITURE INCURRED
UPTO AUGUST-2003
- RS.640.89 CRORES
MINIMUM FUNDS REQUIRED
FOR THE YEAR 2003-2004
- RS.136 CRORES.
PHYSICAL PROGRAMME
2003-04
- RS.275 CRORES

Line Diagram

SCHEMATIC DIAGRAM OF TEMBHU


LIFT IRRIGATION PROJECT

SALIENT FEATURES OF TEMBHU PROJECT


STA
GE

1(A)
1(B)
2
3(A)
3(B)
4
5

NO.

STATIC DISCHARGE POWER


RISING MAIN
OF
EACH DIA LENGTH ROWS HEAD IN CUMECS
IN MW
PUMPS PUMP IN M. IN M.
M.

33
39
3
22
5
4
5

HP OF

1950
2200
1400
1940
1990
1075
1235

2.5
2.5
1.5
2.5
2.2
1.8
1.8

2050
230
1700
3740
1540
1290
2300

6
6
1
4
2
1
1

60.83
86.61
57.98
63.67
30.67
37.47
68.33

57.37
57.37
2.88
35.32
14.91
5.00
4.32

51.00
69.00
2.50
40.68
2.80
4.30

Pump House
I-A with
Erection
of Pumping
Machinery

PUMP HOUSE -1A WITH MANIFOLD

SWITCHYARD 1-A

GENERAL DESCRIPTION
NO. OF STAGES
TOTAL STATIC HEAD

= 5
= 316.91 M.

(STAGE-IA, IB = 147.44 M.,


STAGE-IIIA
= 63.67 M.,
STAGE-IV,V = 105.80 M.)

TOTAL NO. OF PUMPS

= 111

(WORKING 99 + STAND BY 12)

TOTAL H.P. REQD.


TOTAL POWER REQD.

= 1,95,425
= 170.28 MW.

Command Area Map

TALUKAWISE COMMAND AREA IN HA.


Total (Benifited
Villages)

Stages
Talluka (No. of Villages)

KARAD

(218)

KADEGAON

(56)

II

III

IV

--

600

--

--

--

600

(3)

ZZZZ Z

(32)
28300 ZZZZZZZZZZZZ
ZZZZZZZ(41)

5925

3400

20675

4000

2000

--

--

7700

--

--

7700

(15)

(60)

--

--

16000

--

--

16000

(49)

K. MAHANKAL (60)

--

--

7000

--

--

7000

(12)

SANGOLA

(103)

--

--

2000

--

--

2000

(30)

TOTAL

(633)

5925

4000

63675

4000

2000

79600

(182)

240

10

340

30

20

KHANAPUR

(65)

TASGAON

(71)

ATPADI

FUNDS REQD. IN CORES

640

MAJOR WORKS ON RISING MAIN AND CANAL

Railway Crossing work


( Rising Main I A to Pump House I B )

PUMP CROSSING
HOUSE -1A WITH
MANIFOLD
RAILWAY
DIVERSION
WORK

PUMP HOUSE I-B WITH APPROACH CHANNEL

RISING MAIN 1-B

SWITCHYARD 1-B

KHAMBALE TUNNEL & RISING MAIN - 1B

PUMP HOUSE II WITH APPROACH CHANNEL

PUMP HOUSE -1A WITH MANIFOLD

RISING MAIN II

YERALA AQUEDUCT

PUMP HOUSE STAGE III & APPROACH CHANNEL

Devikhindi Tunnel

PUMP HOUSE STAGE IV & APPROACH CHANNEL

PUMP HOUSE STAGE V &


APPROACH CHANNEL

YEARWISE PLANNING
(2003 TO 2006 & ONWARDS)

STAGEWISE PLANNING
(Year 2003-04) CUMMULATIVE AMOUNT
(Rs. in Crores)

STAGEWISE PLANNING
(Year 2003-04)
CUMMULATIVE AMOUNT

(Rs. in Crores)

DIFFICULTIES IN COMPLETING
THE SCHEME
1. REQUIREMENT OF SUFFICIENT
FUNDS :

THE PROJECT PROVIDES IRRIGATION


FACILITIES TO THE DROUGHT PRONE AREA.

THE PROJECT WORKS ARE STOPPED SINCE


LAST TWO YEARS DUE TO INSUFFICIENT
FUNDS.

Contd.

DIFFICULTIES IN COMPLETING
THE SCHEME

BUDGET PROVISION FOR


THIS YEAR
CRORES
MINIMUM REQUIREMENT
FOR THIS YEAR
CRORES

8.47

= 136.00

2. TO MAKE THE EXPENDITURE OF Rs. 640.89


CRORES INCURRED FRUITFUL,
COMPLETION OF BALANCE WORKS ON TOP
PRIORITY IS NECESSARY.
Contd.

DIFFICULTIES IN COMPLETING
THE SCHEME
3. M.S.E.B. SUPPLY

ERRECTION OF H.T. LINE OF 20 KM. FOR


STAGE I & II AND 1 KM. FOR STAGE III IS
NECESSARY.

4. SUPERVISION CHARGES OF M.S.E.B.

IT IS AGREED BY M.S.E.B. TO ACCEPT


Rs.0.25 CRORES WHILE STARTING THE WORK
AND BALANCE AMOUNT RS. 13.50 CRORES
(8.84 + 4.66) BEFORE COMISSIONING THE
PROJECT.

Contd.

DIFFICULTIES IN COMPLETING
THE SCHEME
5. PHYSICAL ACHIEVEMENTS
REQUIRED FOR COMISSIONING THE
PROJECT.

SEPARATE EARLY RELEASE OF FUNDS FOR


WORK PERTAINING TO OTHER
DEPERTMENT (RAILWAY, P.W.D. AND
REVENUE).
ANTISURGE DEVICES WORK IS TO BE TAKEN
ON TOP PRIORITY.
SUFFICIENT BUDGET PROVISION &
RELEASE OF MONTHLY ALLOTMENT OF
FUNDS REGULARLY.

LOSSES DUE TO NON


COMMISSIONING OF PROJECT 1) 22 TMC water allotted to this project
may be lost in future.

2) Drought prone area will not be


benefited by irrigation.

3) Expenditure incurred so far on the


project will be unfruitful.

4) Warranty period of machinery will


be expired.
Contd.

LOSSES DUE TO NON


COMMISSIONING OF PROJECT 5) The project machinery may be
worn-out due to non use.

6) Shifting of cultivators from the


Drought Talukas, due to non
availability of irrigation facility.

7) Project Affected Persons from


Wang Project resettled in Tembhu
Command will suffer from irrigation
facility.
Contd.

TEMBHU LIFT IRRIGATION PROJECT ELECTIRICAL CHARGES.

Tembhu Barrage Across


River Krishna

Thanks