Introduction to McParts

Mechanical development Part system.


A database providing engine and component history,
component failures, test data, build numbers and a
common system for users.
Users are Engineers.
The engineers may be test engineer, assembly
engineer, disassembly engineer, reliability engineer.
Pre production testing.
ENGINE DECLARED PARTS DISPOSITION
The following information is
BUILD required to create a Engine: The Build Engineer
ENGINEER 1.Parts List determines about the
2.Std Disposition if
Lube,TORQUE,DODEL,RATI Parts/Engine
NG,CPL etc

INSTALLS
WRITES TEST PERFORMS INCIDENT END OF REMOVE ENGINE
ENGINE IN
PLAN TEST ENTRY TEST FROM TESTCELL
TESTCELL

Once test plan is The Test Engr


On any failure, At EOT,the
TEST approved, a test and Technician
TE Writes the Incidents are following
ENGINEER cell is assigned performs the test
testplan,Technician reported on the details are
by the OPS,the and records Decision is made to
Name and all their parts as noted:
engine is data.Test Disassemble the
information related 1. Fail Only 1.Engine
installed for Comments are parts or hold on to
to testing the 2. Fail + Hrs
testing. posted and is the parts
engine at the test Replace 2.Engine
The Test Engr uploaded into
cell 3. Replace Only Miles
initializes the test McParts using
(Refer Slide 2) 3.EOT Date
cell OTTO

DISASSEMBLY PROCESS TEARDOWN DISASSEMBLED

The CE informs the


Journeyman that the engine is
Once disassembled, the Test
ready for a teardown and sends
Engineer is responsible to
out the disassembly Engine is moved to
Test Data entry and
instructions to the JM.The last build area and is now
Component Engineer is
step in the engine disassembly disassembled
responsible for Disassembly
process is the teardown review
Instructions/Disposal of parts
and EQA (Engine Quality Audit)
is done
Engine Life Cycle
To track component information, failures and test
data, an engine must be set up.
The engine record contains specific information
about the engine such as: the test type, the engine
owner, duration of the test, where the engine will be
assembled, approximately when the test is expected
to start and a short test description.
The build engineer sets up an engine.
Engine Assembly: The technician is able to get all the
necessary instructions for assembling the engine from
the database. The instructions include: torque
requirements, inspection requirements (the technician is
responsible to make sure all the necessary components
are taken to inspection and are measured before
assembling the engine), assembly instructions
(measurements made while assembling the engine), and
the approved parts list.
Engine Test: After the engine is assembled, the engine
is ready to be set up in the database for testing.
Engine/Component Failures: Failures may be loaded
for any component on the parts list for the engine.
Engine Disassembly: After the testing has been
completed the build engineer should put the engine on
disassembly. The technician assigned to the
disassembly of the engine will be notified when the
engine is ready for disassembly. From McParts, the
technician can get disassembly instructions and the
final inspection instructions. The parts are then laid
out for a teardown review.
Engine Disposition: After the tear down review, all
the engineers must dispose of their special parts and
the build engineer has the responsibility to dispose
all of the parts of the engine that are not declared
special (the standard parts).
Driving Forces: The engine life cycle is driven by the
internal message system of McParts. The messages
are referred to as action items.
Build Type Definitions
Standard
Test only
Parts only
Partial Parts List
McQuik
Standard: Most builds are defined in McParts to be
built from the master parts lists, then tested, data
entered for a full build history, these builds are called
Standard.
Test only: The test only engine does not have a parts list
and thus can not track incidents. It does not send out
any messages to the engineers in regard to the engine
declaration, assembly, disassembly, and disposal.
Parts only: This build does not allow the test cell to be
initialized and thus no test data may be entered.
Partial Parts List: The full parts list may be added just
prior to assembly in order to be more accurate.
McQuik: A McQuik build is a type of rebuild; all the
components are automatically reused from the previous
build for the new build. It has minimal or no part
changes from one build to the next.
Engine Form
Assembly assignment: To notify the assembly
engineers the engine is ready for assembly.
Disassembly assignment: To notify the disassembly
engineers the engine is ready for disassembly.
Special parts: The engineers are assigned for a
particular part of the engine.