Lean Construction

Shilpa AH17153
Sathish AH17147
Shivam AH17155
Rajath AH17136
Rakesh AH17155
WHAT IS LEAN?
+
LEAN CONSTRUCTION

Lean construction is a new way to design


and build capital facilities.
It challenges the generally accepted
belief that there is always a trade
between time, cost and quality.
It is a combination of operational
research and practical development with
adaption of lean principles and methods.
+
LEAN CONSTRUCTION
+
PRINCIPLES OF LEAN
CONSTRUCTION
Identify value from customers point of
view.
Generally in traditional approach it is what
the customers wants to build. But
according to lean construction it isn't
about what to build but why.
It brings together all stakeholders,
architects, engineers, contractors, sub
contractors and suppliers.
+Define value stream

Once the customers point of view is


clear we can take all necessary
process to deliver those values. This
is called value stream.
For each activity the necessary labor,
information, equipment and material
are defined.
WASTE VALUE
2 LINKED STEPS
Unnecessarymovementofproductof
materials.
Ideallytransportshouldbe
minimized.
Materialsareexposedtohandling
damage.
Resource allocation
All stock should be managed
Every day inspection is done to check
that stock is in condition
MOTION
Term refers to the extra steps taken by
people to accommodate inefficient
process layout, defects or excess
inventory.
Motion takes time and add no value to
the product or service
To move and add value is called motion
WASTESHOULDBE
MINIMISED

WAITING

Not
value
Defects Overproduction
added
activity

Over
processing
IMPLEMENTINGLEANINPRACTICE

Identifyanddelivervaluetothecustomer
value:eliminateanythingthatdoesnotadd
value
Organizeproductionasacontinuousflow;
Perfecttheproductandcreatereliableflow
throughdistributinginformationanddecision
making
Pursueperfection
CASESTUDY
+

BENEFITS FOR
CUSTOMER
MANGEMENT
AND STAFF
+
CUSTOMER

FLEXIBILTY RESPONSIVNES TIME AND


S QUALITY

CONSISTENCY LOWER COST


+
ORAGANISATION

CASH FLOW REDUCED ASSET


STOCK UTILIZATION

ENVIRONMENTA
L BENFITS
+
PROJECT MANAGER

COPERATIVE RELIABILITY LESS CRISIS

DELEGATION
+
CIVIL ENGINEER

SAFETY SATISFACTION OWNERSHIP


OF WORK
AREA

LESS STRESS
+
ACTIONREGARDINGLEANMANGEMENT

1.PULL PLANNING

2. WORK FLOW FOR LEAN


CONSTRUCTION
Pull planning
Specifies handoffs and communicates
quality, safety and efficiency performance.
Promotes a team approach to efficiently
sequence work .
Optimizes team productivity.
+Work flow for Lean Construction
+
Methodologies For Attaining lean
Construction
Just in Time(JIT).
Total Quality management (TQM).
Time based competition.
Concurrent engineering.
Value based management.
Visual management.
Total productive maintenance(TPM).
Employee Involvement in work.
+
DRAWBACKS OF LEAN
CONSTRUCTION
Brea
k

New DRAW
syste BACK Teamwor
k
m
S

Trainin
g
+
Drawbacks of Lean

Construction
If there is a break in the lean method chain, than the lean
methodology cannot work.

Training employees with a new system can take some time,


and this could decrease the overall time on a project or
design.

Staying on course with a new system of operation can be


difficult for some managers, and some may grow frustrated.

In order for successful implementation, management officials


must be able to guide employees directly and efficiently.

Cohesive teamwork is essential for lean production. Each


worker has to be well versed in his position or a breakdown
will occur as all workers rely on one another.
+
CONCLUSION

Effective
Design

Better
Time
Quality CONCLUSION Productivit
y

Cost
Saving
+
Conclusion

Lean Design and construction enhances value on projects and uncovers


wasted time, wasted movement and wasted human potential.

Lean Construction Results in Better time Productivity, Reduced safety


hazards and cost savings.

Lean Construction can lead to strong benefits across a range of


performance such as quality, effective design, etc.

So the Lean construction is more essential to implement in all the


construction project.