You are on page 1of 16

Bab 1.

Introductions
a. History, present, future of science and technology
b. Fundamentals problem and the way we go
c. Terminology
d. How is logging viewed by others
e. Wellbore environment
f. Logging contract
g. Preparing logging program
h. Wellsite mud logging
a. History, present, future, of science and
technology
HISTORY PRESENT FUTURE

1927 Measurement Nuclear


Schlumberger While Drilling technology
brothers (MWD) Nuclear
Electrical Logging While Magnetic
Coring / Drilling Resonance
Electrolog (LWD)
Archie
equation
1942
History
Pada tahun 1927 Schlumberger bersaudara menciptakan alat
pengukur resitivitas yang digunakan pada sumur minyak di
Pechelbronn/Alsace, beberapa dasar-dasar dari alat pertama
Schlumberger bersaudara masih digunakan pada teknologi sekarang,
yakni :

1. Menggunakan resistivitas secara terus menerus untuk mengukur


kedalaman (dinamakan log)
2. Kerja yang terus menerus itu ditransformasikan menjadi data baik
itu karakteristik reservoir, proses pengolahan data ini dinamakan
interpretasi
Macam log pada periode pertama :
1. Log resistivitas (digunakan untuk
penentuan saturasi air untuk clean
rocks)
2. Log potensial (pemisahan pasir dan
shale)
3. Log akustik (log porositas, menggunakan
rumus Willys, 1956)
b. Fundamentals problem and the way we go

Pengukuran geofisika lubang bor perlu kita


lakukan untuk menyelesaikan beberapa
problem yang akan kita temui pada beberapa
proses :
1. Eksplorasi dan produksi hidrokarbon
2. Eskplorasi air dan gas termal
3. Eksplorasi mineral
4. Investigasi Geoteknikal
5. Dan berbagai macam problem di sains
bumi
Pada praktek pengeboran kita akan
mendapat dua macam data yaitu :
1. Reservoir (Porositas, saturasi, dan
permeabilitas)
2. Log (resistivitas, radiasi gamma)

Data data tersebut kemudia kita olah


kembali menjadi parameter yang kita
gunakan untuk mengetahui sifat reservoir
3. Istilah-istilah
STOIIP = stock tank oil initially in place; usually measured in stock tank barrels (stb)
GIIP = gas initially in place; usually measured in billion standard cubic feet (Bcf)
GBV = gross bulk volume; the total rock volume of the reservoir containing
hydrocarbon
NPV = net pore volume; the porespace of the reservoir
HCPV = hydrocarbon pore volume; the porespace actually containing hydrocarbon
f = porosity; the proportion of the formation that contains fluids
k = permeability; usually expressed in millidarcies (md)
Sw = water saturation; the proportion of the porosity that contains water
Sh = hydrocarbon saturation; the proportion of the porosity that contains hydrocarbon
FWL = free water level; the depth at which the capillary pressure in the reservoir is
zero; effectively the depth below which no producible hydrocarbons will be
found
4. Apa yang dicari dengan penggunaan logging ?

1. Geofisika :
- akuratkah data dari logging?
- dapatkah kita mengetahui zona potensial melalui data
seismik?
2. Geologis
- apa saja hasil yang didapat melalui logging?
3. Insyur pengemboran
- dimana kah lokasi yang tepat untuk memposisikan
peralatan pengeboran?
4. Reservoar engineering
- apa saja kandungan yang ada didalam sumur?
The Drilling Engineer:
What is the hole volume for cementing?
Are there any Key-Seats or severe Dog-legs in the well?
Where can you get a good packer seat for testing?
Where is the best place to set a Whipstock?

The Reservoir Engineer:


The Reservoir Engineer needs to know:
How thick is the pay zone?
How Homogeneous is the section?
What is the volume of Hydrocarbon per cubic metre?
Will the well pay-out?
How long will it take?
5. Wellbore environment
6. Kontrak Logging

Kontrak logging terjadi antara pihak


kontraktor dan pihak perusahaan, disetiap
bulannya perusahaan memberikan diskon
kepada kontraktor sesuai dengan
penghasialan perbulannya. Beberapa
perushaan juga menerapkan aturan
pengurangan biaya apabila terjadi
kesalahan mesin, dan juga memberikan
bonus tambahan apabila penghasilan yang
didapat memuaskan.
Beberapa hal yang ada didalam kontrak :
1. Rincian biaya
2. Rincian peralatan yang akan digunakan
3. Biaya sewa alat
4. Biaya sewa pekerja, dll
7. Mempersiapkan program logging

Sebelum melakukan proses logging kita perlu


mempersiapkan beberapa hal, yaitu :
The actual mnemonics of tools to be run
(dependent on the
contractor)
Intervals to be logged if different from the
total openhole action
How the tools are to be combined to form
the individual
toolstrings
Data transmission/delivery requirements
8. Wellsite mud logging

Pada saat pemboran berlangsung, terdapat


mud logging unit, yang memiliki dua fungsi
yaitu:
Memonitor keadaan sumur
Untuk memberikan informasi mengenai
sumur sebagai acuan pengambilan
keputusan lanjutan
Reference

BASIC WELL LOGGING AND


FORMATION EVALUATION.JURGEN
SCHON.2015
WELL LOGGING AND FORMATION
EVALUATION.TOBY DARLING.2005
WELL LOGGING FOR EARTH
SCIENTIST.DARWIN & SINGER.2008

You might also like