The document summarizes potential significant impacts and mitigation measures during the pre-construction, construction, and operational stages of a project. During pre-construction, tree clearing could impact flora and fauna and cause soil erosion. Construction activities like dust from vehicles and noise from machinery could impact air quality, noise levels, and traffic. The operational stage would generate domestic waste of 0.5 tons per day and increase employment but also population growth and socio-cultural issues.
The document summarizes potential significant impacts and mitigation measures during the pre-construction, construction, and operational stages of a project. During pre-construction, tree clearing could impact flora and fauna and cause soil erosion. Construction activities like dust from vehicles and noise from machinery could impact air quality, noise levels, and traffic. The operational stage would generate domestic waste of 0.5 tons per day and increase employment but also population growth and socio-cultural issues.
The document summarizes potential significant impacts and mitigation measures during the pre-construction, construction, and operational stages of a project. During pre-construction, tree clearing could impact flora and fauna and cause soil erosion. Construction activities like dust from vehicles and noise from machinery could impact air quality, noise levels, and traffic. The operational stage would generate domestic waste of 0.5 tons per day and increase employment but also population growth and socio-cultural issues.
MITIGATION MEASURES • Significant impact – 3 construction Pre-construction Construction Stage Occupational stage Impact – ( Pre-construction Stage ) • Lodging trees ( surrounding area – bushes and trees) - presence tree to the surrounding area. - these activities cause the soil erosion to nearby area - give significant impact to biological environment include flora and fauna (consists of beetles, cicadas, birds, rats, bats and possible snakes ) • Construction dust - site clearing of the proposed project and the movement of the vehicle such as dump truck, backhoe machine - resulting the formation of dust to the nearby existing development - air quality impact to become low and cause air pollution towards the surrounding area. Impact – (Construction Stage) • Noise pollution and vibration - during the construction stage will be the main problem towards the existing development surrounding this area.
- would be exceed the limits by DOE Noise Ordinance during the
construction and lodging activities
- harmful towards the resident and surrounding of the nearby
construction site. • Mobilization of heavy vehicle - Machinery and equipment will be mobilized to the site especially for site clearing purposes and earthwork phase (cut and fill in proposed platform)
- occurs mobilization heavy equipment to the site will cause
disturbance towards the residential areas & traffic slow moving vehicles are occurred.
- May resulted potential accident due to compacted resident
• Temporary occupation (working flow) - Required medium generators sets installed for power generator. Using fuel in daily basis and emissions in the form of 𝑁𝑂𝑥 and 𝑆𝑂𝑥
- Estimate that 15 – 20 construction workers will be employed.
- Assuming each worker generates 10 gpd of sewage, it is estimated
that 150 gpd of sewage will be generated from A the construction workforce • Construction of Building and Infrastructure - involve construction of the buildings required in the development parcel - 8 hour exposure above 90 dB(A) can be detrimental to the residential communities
- The quantity of the wastes generated is anticipated to be small and
major bulk of waste will consist of plastic material.
- Improper disposal of the construction wastes will contaminate land
besides the aesthetic repercussions. Occupational Stage • Generation of Domestic Wastes - Domestic wastes will be generated once the Proposed Project is occupied which will have to be managed and disposed The domestic wastes are estimated to consist of kitchen waste (41%), paper (14%), plastic (12%), grass and wood (17%) and metal (4%).
It is estimated that 0.5 tonne per day of domestic wastes will be
generated from full occupancy of the residential units. • Human environment - Generate more employment opportunities to the local community
-Increase in number or residential unit and facilities / infrastructure,
quality of life, business opportunity as well as population.
-In-migration of families and transient population form various