FIRE HAZARD AT 132KV GRID STATION BHAGWAL CAUSING MAJOR BREAK


DOWN AND RESTORATION OF POWER SUPPLY

PRESENTED BY
ENGR. IMTIAZ-UR-REHMAN
EXECUTIVE ENGINEER
GSO IESCO ISLAMABAD
TABLE OF CONTENTS
S.No DESCRIPTION PAGE #
.
1. Acknowledgement 1.
2. Dedication 2.
3. Self Introduction 3.
4. Service Background 4.
5. Objectives 5.
6. Case History 6.
7. Causes of Breakdown 7.
8. Rescue/Restoration of Power Supply 8.
9. Job Planning / Management 9.
10. Allocation/ Mobilization of Staff & 10.
Material
11. Achievement 11.
12. Recommendation 12.
ACKNOWLEDGEMENT
 First of all I am thankful to Almighty Allah
the most Merciful and Most Beneficent to
humanity who gave me courage to seek
knowledge.
 I am extremely thankful to my parents/
Seniors who guide me in every step of life
to achieve my goal.
 I am highly grateful to honorable course
Director and Deputy Director for their
valuable guidelines.
DEDICATION

 I WOULD LIKE TO DEDICATE ALL OF MY EFFORTS TO


MY PARENTS AND TEACHERS, WITH THEIR HELPS
AND GUIDENCE I'VE GOT THE PRESENT PLACE
SELF INTRODUCTION
. NAME . IMTIAZ –UR- REHMAN

. QUALIFICATION . B.E (ELECTRICAL), M.S (ELECTRICAL) MBA,

. JOINED IESCO . IN THE YEAR______________

. PRESENT POSTING . SE GSO CIRCLE IESCO ISLAMABAD

. WORK EXPERIENCE . __________YEARS


SERVICE BACKGROUND
 ASSISTANT ENGINEER _________________________

 SENIOR INSTRUCTOR AT R.T.C ISLAMABAD.

 EXECUTIVE ENGINEER SS&TL DIVISION IESCO

ISLAMABAD.

 SUPERINTENDING ENGINEER GSO CIRCLE IESCO

ISLAMABAD.
OBJECTIVES
 The objective of my individual management experience is to
share my Field Experience / Management Skills and
Knowledge.
 To enhance my Presentation Skills.
 To fulfill the requirement of the course work.
 To motivate Professional Engineers to adopt the Proper
Managerial Approach in Odd Hours.
 To improve the Dignity of Company and self through Positive
Efforts.
CASE HISTORY
 Break Down at 132KV Grid Station
Bhagwal due to fire hazards causing
Damages /Burnt of following
equipments :
 11KV Incoming Panel 02 Nos
 11KV outgoing Panels 09 Nos
 11KV Buscoupler Panel 01 No

 Auxiliary Panel01 No

 AC / DC Panel 01 No

 Power Cables Partially Damage


DAMAGED 11KV PANEL
DAMAGED 11KV PANEL
DAMAGED 11KV PANEL
DISMANTLED DAMAGED AUXILIARY
PANEL
DISMANTLED DAMAGED AC/DC PANEL
DAMAGED 11KV POWER
CABLE
DAMAGED 11KV POWER
CABLE
CAUSES OF MAJOR BREAKDOWN
 Flashing of 11 KV O/G Feeder Panel C.T.
 Failure of Protection System due to Fire.
 Shortage of Staff for Proper Vigilance.
 Frequent Trippings due to inadequate 11 KV O/G
Feeders Maintenance.
GEOGRAPHICAL LOCATION OF SITE

 The Grid Station is located in Neela (Bhagwal) a

village of District Chakwal located at a distance of

240 KM away from Islamabad.

 All the Logistics and other Resources were to be

arranged from Islamabad, as they were not available

at site.
RESCUE OPERATION
After receiving Telephonic Call from SSO Incharge of the Grid
Station A.E (T) Chakwal and undersigned rushed towards the
site without loss of any time besides informing to Rescue 1122
and Fire Brigade to reach at site from Chakwal about 120 K.M
from the Grid Station. Rescue Operations were started and Fire
was brought in to control through Fire Brigade, without any loss
of human life .
 First of All Power Supply of affected area was restored from
Near By Grid Station through 11 KV Feeders passing in its
vicinity.
 It was not possible to re-utilize the damaged/ burnt equipment,
that’s why the required material for restoration of Power Supply
was got allocated from Wah Store on emergent Basis and
Managed shifting of same at site with the help of a Gang
arranged from SS&TL Division Islamabad.
 After Mobilizing the Staff at site Parallel activities like
Dismantling of damaged equipments, Civil Works required for
R&M / White wash of the affected 11 KV Room were also
ALLOCATION/SHIFTING OF MATERIAL & STAFF

 Total material was got allocated and shifted to site of

work

 Necessary logistic services including crane/trucks

etc, were dispatched to site.

 T&I and P&I staff was mobilized to the site of work

for inspection and evaluation of Materials


NECESSARY LOGISTIC SERVICES
PROVIDED
WORK MANAGEMENT

 After doing all necessary arrangements, I personally


reached at site to supervise the Rescue
Operations/Rehabilitation work on Emergent Basis.
04 x Gangs were established assigning the
following duties:
Gang-I: To assist the labour already
engaged on dismantling of
damaged/burnt equipment.
Gang-II: This Gang was assigned the task to
shift the healthy equipment in the control
and switch room.
WORK MANAGEMENT
Gang-III: 3rd Gang was assigned the task of
Installation and coupling of the
equipments.
Gang-IV: This Gang was assigned the task of
cabling Work as well as termination of Control
Cables and the last and the final gang
comprising the staff of P&I &
T&I were
assigned to carry out the
testing work in
parallel.
ACHIEVEMENTS
 Entire work was completed on accelerated basis while utilizing the

best Managerial Skills through Parallel Activities making full use of

Precious Time. The Power Supply was restored from the affected

Grid within a Record Time of 18 Hrs through hectic efforts of

A.E (T) Chakwal A.E (M) Maintenance and their Gangs.

 CEO IESCO has awarded COMMENDATION CERTIFICATE to Me

and My Team for our Whole Hearted Efforts.