A Study on Risk Assessment and

Management
in Construction of
Gautam Buddha International
Airport

Sujata Shakya
073/MSCM/317
30thJune, 2018
Scope of Study
 Airfield area ( Apron , Taxiway and Runway)
of Gautam Buddha International Airport.
Introduction
 Gautam Buddha International Airport  second international
airport  ADB Funding  project under  Rastriya Gaurav
Aayojana  Consultant BDA Nepal (in association with Yooshin
Engineering Co-operation Korea )  Chinese contractor Northwest
Civil Aviation Airport Construction Group and the Nepali sub-
contractor Northwest Infra Nepal

 Airport projects  very complex  face a number of challenges 


inevitably expose them to risks.

 Consequences of Risk

 Cost overrun

 Time overrun

 Operation defect and threat to flight


Need and Importance
 Construction sites of the airport  very
important.
 Risk starts on the ground goes up into
the air and ends on the ground.
 Any accident due to construction and
management inconsistency  the giant
hazards and financial loss.
Problem Statement
 If the identified risks are not properly
assessed and managed during construction
phase, there is chance of noncompliance
with the certification system before
operation as well as high probability of
accidental hazard during operation.
Objective :
 to identify different types of risk associated with
construction of Gautam Buddha International
Airport.
 to prioritize those identified risk during
construction and then its assessment .
 to identify the Mitigation and Control measures
for highly prioritize risk during construction
phase and prepare a Risk Control Plan for it.
RESEARCH METHODOLOGY
Research Approach
• Existing Resources:
Literature Review
Methodologies Review

• Data Collection:
Identification of respondent and sample size
questionnaire survey with identified respondent
Final Analysis of the collected data through
quantitative analysis.
RESEARCH METHODOLOGY
I. Literature Review

 Identification and study of National Airport Project with


implementation of “Risk Assessment and Management ” plan.

 Review of the mitigation measures.

II. Internet Sources

 Risk assessment and management approach in International


Airport Project .

 Comparative study with our current trend in Airport


construction project and finding the remedies and suggestive
measures.
RESEARCH METHODOLOGY
III Study Area

 CAAN(Civil Aviation Authority of Nepal )

 Gautam Buddha International Airport

 IATA ( International Air Transport Association),ICAO (International


Civil Aviation Organization ) airport code

 Rastriya Gaurav Aayojana Office, Consultant BDA Nepal (in association


with Yooshin Engineering Co-operation Korea )

 Key sources for the information and data collection of Gautam


Buddha International Airport Ar. Chadha Malla Shrestha Maskey,

Er.Tirtha bahadhur Joshi (Airport Engineer),

Er. Pravesh Adhikary (Professor of Airport Engineering of IOE )

Er. Pramode Shaha ( Site Engineer from consultant BDA Nepal)


Risk Assessment Matrix
 Developing Checklist of risk in Airport Project
RESEARCH METHODOLOGY
Risk Analysis Technique (Quantitative technique)
 Monte Carlo Simulation

 Sensitivity Analysis

 Decision Tree and Network

Risk Control Technique


 Remove

 Reduce

 Avoid

 Transfer

 Acceptance
References
 Civil Aviation Authority on Nepal
 FAA (Federal Aviation Administration )
 website of ICAO, IATA
 wikipedia.org/wiki/Gautam_Buddha_Airport
 Article
 Risk Assessment and Management of Runways
Construction Operation of military Airports using FAHP
and ORMIT(Sept2014)
 Saudi Arabian Aviation Construction Projects :
Identification of risks and their consequences (2015)
 Risk Response Preferences on Public Private Partnership
(PPP) in Indonesia Airport Infrastructure Development
 Airport Construction Risk Management Services by MP2
Consulting (2013)
 A risk assessment procedure for the safety management of
airport infrastructures (2014)
THANK YOU !!!