Professional Documents
Culture Documents
(M.E.S.)
Near Far
Far Near
Priority
Priority
H2S Level
H2S Level
Arrange for lowest swing Arrange for lowest swing Arrange for lowest swing
What is S-Position?
Definition: is an accumulation of more than
one distribution.
Description: S-Position or super position
method is a very good technique used for
campaign maintenance strategy and loop
based maintenance . It is also a tool for
multiple year positioning.
S-Position Method
Instrument Mechanical
1400 1400
1200 1200
1000 1000
800 800
600 + 600
400 400
200 200
0 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
=
Instrument & Mechanical
1400
1200
1000
800
600 Unreal
400
200
Work load
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
How Leveling tool works?
S-Position
Filter
Ratio Table
Row data Data
Maximo from PM, To be
DB JP, and WO processed
Distribution
List
Criteria (Tuning)
Update Next date
Filter
YPP List
Data
Not sorted
Data after
Or
Leveling
sorted
Results
Using YPP
Risk
Assessment
And
approval
Case Study (Basic information)
Company: GUPCO (JV EGAS & BP)
Industry: Oil and Gas
Production: produces, and treats over 120,000
SBPD of oil and 212 MMSCFD of gas.
Location: Ras Shoukier District
Platforms: 125 platform
Locations/Assets: 150,000
PM’s: 45,000
Case Study (District Map)
87 SATELLITES
8 PRODUCTION
PLATFORMS
RAS SHOUKEIR
DISTRICT
8 GAS LIFT 24 GAS LIFT
PLATFORMS MODULES
150,000
2 GAS PLANTS
LOCATIONS
3 WATER FLOOD
2 PROCESS AREAS
8 UTILITIES
(POWER HOUSE, TANK FARM, …ETC.)
Case Study ( Before/after leveling)
Before leveling After leveling
10,000 overdue WO’s for safety critical 10,000 overdue WO’s for safety
equipments. critical equipments has been
eliminated within one year
Unbalanced work load. Flexible and customizable work
load.
Man hours utilization ratio not exceed Man hours utilization ratio reached
30%. 50%
Each discipline transportation hours
Each discipline has a restricted ( helicopter, and Boat) appears
transportation hours ( helicopter, and
Boat) which is not sufficient for all jobs sufficient for the high priority jobs
BP road map for maintenance strategy BP road map for maintenance
has a progress near to be zero. strategy jumped directly to resources
optimization, planning, and
No opportunity to begin maintenance campaign maintenance
optimization process. maintenance optimization process
was realized.
Conclusion