You are on page 1of 6

CE444

REINFORCED
CONCRETE ‘-

DESIGN
DINAH FE T. OLITAN
MW (3-6)

1
Course Outline References
Introduction
 Analysis and Design of Singly
Reinforced Beams
 Analysis and Design of T-Beams
 Analysis and Design of Doubly
Reinforced Beams ‘-
 Beam Shear and Torsion
 Columns
 Footings
Grading System
Term Test – 40%
Quizzes – 30%
Lab. Exercises & Project – 20%
Attendance – 10% 2
Class Rules Course Requirements
On Attendance: • Compilation of Laboratory Exercises
• Attendance ≥ 80% (else, FAILED)
• Excused + unexcused absences ≤ 20% (else, • A Two-Storey Apartment Plan
FAILED) LOT LOT LOT
• Provide an Excuse Letter (else, Absent) 9.85M
• 30minutes late is considered absent.
On Special Quiz/ Exam:

11.33m
• Can only be taken within one (1) week with

12.25m
‘-
LOT LOT
medical certificate or a letter from Dean
(else, a grade of 40)
• Provide an Excuse Letter (else, a grade of 40) 9.95m

• A 10% deduction in rating will be sanctioned 10M ROAD


except with medical certificate.
On Cheating: LOT 3568-L-7-H-8-A-3
• Automatically FAILS the subject.
1-2 S 70-45 E 9.95m
On Laboratory Exercises:
• Submit within 1 week only (else, a grade of 0) 2-3 S 27-52 W 12.25m
• When excused, submit right after your
attendance 3-4 N 65-28 W 9.85m
4-1 N 27-52 E 11.33m 3
RUBRICS FOR LABORATORY EXERCISES
4 = Exceeds 2 = Below
CRITERIA 3 = Meets Expectation 1 = Not Acceptable
Expectation Expectation
Content 100% complete 90-99% complete 75-89% complete Less than 75% complete
(40%)
Complete, accurate, Complete but some are Incomplete but Incomplete, inaccurate,
Diagram,
well and nicely drawn to inaccurate and somehow accurate, well and and not nicely drawn to
Chart or
Graph (20%)
show and support nicely drawn to show and nicely drawn to show show and support solution.
solution. support solution. solution.
Followed the required Followed the required Did not follow the Did not follow the required
format, organized, easy format, organized and required format, format, not organized and
Format
to follow and references reasonably easy to
‘-
somewhat organized difficult to follow.
(20%)
were properly cited (if follow. and easy to follow.
applicable).
Timeliness Submitted before due Submitted on due date. Submitted one (1) day Submitted more than one
(10%) date. after due date. (1) day after due date.
Uses long, clean and Uses long, clean and Uses long, some Uses dirty and crumpled
non-crumpled bond non-crumpled bond unclean and crumpled bond papers with narrow
papers with one (1) inch papers with borders on bond papers with to no borders, papers
Neatness
border on all sides, all sides, somewhat narrow borders on stapled together.
(10%)
clean and neatly clean and neatly clip most sides, papers
bounded with non- bounded. stapled together. 4
plastic cover. 4
RUBRICS FOR THE PLAN OF A TWO-STOREY APARTMENT
3 = Meets 2 = Below
CRITERIA 4 = Exceeds Expectation 1 = Not Acceptable
Expectation Expectation
100% complete with plans, 90-99% complete with 75-89% complete with Less than 75% complete
Content drawings, estimates and plans, drawings, plans, drawings, with plans, drawings,
(50%) computations estimates and estimates and estimates and
computations computations computations
High level of creativity with Good level of creativity
Few unique aspects No creativity, highly
Design&
a novel and original with some evidence and almost a derivative derivative from samples
Functionalit
y (20%)
approach. from samples from samples and or and or other student’s
other‘-student’s work work.
Followed the required Followed the required Did not follow the Did not follow the
Format format, organized, very format, organized and required format, required format, not
(10%) easy to follow. reasonably easy to somewhat organized organized and difficult to
follow. and easy to follow. follow.
Timeliness Submitted before due date. Submitted on due date. Submitted one (1) day Submitted more than one
(10%) after due date. (1) day after due date.
Uses long, clean and non- Uses long, clean and Uses long, some Uses dirty and crumpled
crumpled bond papers with non-crumpled bond unclean and crumpled bond papers with narrow
Neatness one (1) inch border on all papers with borders on bond papers with to no borders, papers
(10%) sides, clean and neatly all sides, somewhat narrow borders on most stapled together.
bounded with non-plastic clean and neatly clip sides, papers stapled
cover. bounded. together. 5
Laboratory #1 Accdg. To NSCP 2015,
1. What is Concrete? 6. What are the concrete design
2. What is Reinforced Concrete? properties? (Sec 419.2)
3. What are the advantages of using 7. What are the concrete durability
concrete? requirements? (Sec 419.3)
4. What are the disadvantages of ‘-
8. What are the different types of Loads?
using concrete?
(Chapter 2)
5. Give the historical background of
concrete & reinforced concrete. 9. What are the different types of Load
Combinations? (Chapter 2, Sec 405)

You might also like