Professional Documents
Culture Documents
Automation
Chris Golden
Senior Account
Manager
Nalco Company for Boilers
3D TRASAR for Boilers
3D TRASAR for boilers
delivers maximum
performance.
performance
– Safer operation
– Improved system
reliability
– Lowest Cost of Operation
Technology scope
– Advanced monitoring &
control
– Performance sensors
– New chemistry
– Software
– Wireless communication
for Boilers
Performance Management
Performance for Boiler
Management for BoilerSystems
Systems
for Boilers
3D TRASAR Boiler Basic System
@T ORP TM
Controller &
Fluorometer
Boiler
Sample
Automatically responds
45
45 40
TRASAR Automation
40
35
40
35 Detect
35 System
ppm 22310
30 30
30 Upsets
ppm 22310
25 25
20
25
20
20
Maintain optimum treatment levels
15 15
15
10 10
10
5 Optimum Operation 5
5
0
0
10/11/1997
0 1/10/99
20/11/1997
01/20 /99
30/11/1997
0 1/30/9 9
0
01/10/99 20/12/1997
10/12/1997
0 2/09/99
Date D a te
01/20/99 30/12/1997
0 2/19/9 9
01/30/99
09/01/199802/09/99
0 3/01/99
19/01/1998 02/19/99
03 /11/99 Date03/21/99
Keeps your boiler clean
03/01/99 03/11/99 03/21/99
3D TRASAR Preboiler
@T ORP Corrosion Control
Boiler
Sample
Today: Tomorrow:
Test Oxygen Continuous, Real-
Time Measurement
Test Scavenger
of Corrosion
Residual
Potential
Inspect
Automation of
Equipment
Oxygen Scavenger
Feed
-100 0
@ Temp Orp (mv)
-200 -100
RT ORP (mv)
-300 -200
-400 -300
-500 -400
-600 -500
-700 -600
Time (hrs)
@TPerformance
ORP moreManagement
sensitive than RT Systems
for Boiler ORP to
optimize CHZ feed for Boilers
@T ORP vs Dissolved O2
0 500
400
-0.1
@T ORP vs EPBRE (V)
300
DO (ppb)
-0.2
200
-0.3
100
ORP
-0.4 Cell Internal 0
Configuration
20 Minutes
High Low
Underfeed Results in Corrosion
Chemical Treatment
Potential
Low High
• Promotes passivation
0.2
– Asset protection
– Minimize downtime
-0.8
1/23/2006 0:00:00
3/14/2006 0:00:00
5/13/2006 0:00:00
2/12/2006 0:00:00
2/22/2006 0:00:00
3/24/2006 0:00:00
4/13/2006 0:00:00
4/23/2006 0:00:00
5/23/2006 0:00:00
6/12/2006 0:00:00
2/2/2006 0:00:00
3/4/2006 0:00:00
4/3/2006 0:00:00
5/3/2006 0:00:00
6/2/2006 0:00:00
– Maximize Availability
– Improve turbine efficiency Figure 1: LP #3 AT-T ORP Results During Phase 1 and 2 of AEPCO Trial
Boiler Configurator
Web
Server
Dynamic Control
Performance - Expanded
Management MOC Systems
for Boiler Approach
for Boilers
3D TRASAR Web
System Performance Monitoring
3D TRASAR Web is...
• A convenient way for Nalco Reps
and Customers to monitor system
performance, and the value of 3D
TRASAR control
• View performance summary of all
systems
• Display performance detail for a
single system
• Generate, print, and schedule
graphs and reports
• Download data to your PC for
advanced analysis and reporting
with Vantage V100
• Alarming
@T ORP
+
3D TRASAR
Web
data analysis, reporting
and alarming Controller & Fluorometer
Safety Reliability
for Boilers
TCO